20 likes | 187 Views
HSL Dynamic C2 Prototype. Prototype developed in three days at Cambridge. Development team included: NWDC, TFW, CINC21, NPS, MITRE, Labs. -Today’s ”Demo” is unclass single ops thread only. Prototype is extensible, adaptable, changeable, maintainable, scaleable…
E N D
HSL Dynamic C2 Prototype • Prototype developed in three days at Cambridge. • Development team included: • NWDC, TFW, CINC21, NPS, MITRE, Labs. • -Today’s ”Demo” is unclass single ops thread only. • Prototype is extensible, adaptable, changeable, • maintainable, scaleable… • supports rapid coevolution of prototype with • operational concept
Way Ahead • Prototype provides solid first step in coevolution process. • Integrated into HLS concept development process. • Integrated into HSL C2 wargame 29-31 Oct at NWC and NPS Monterey game 6-8 Nov complete. • Follow-on wargames planned. • Coordination/visits with ONI, USCG, Fleet, Customs, others underway. • Transition path through TFW (Dec 01 pilot portal) /CINC21 planned and promising. • Delivery of C2 capabilities to HLS nodes May 01.