200 likes | 336 Views
LMC 25 - 5 th August. Conclusion: 3.5 TeV rising towards 5 TeV later. LMC 26. Steve on the last LMC and the 3.5 TeV decision A first look at 3.5 TeV - Mike. Initial operating energy of the LHC. Steve. 3.5 TeV – prelim. Acknowledgements: Ralph Assmann Werner Herr.
E N D
LMC 25 - 5th August Conclusion: 3.5 TeV rising towards 5 TeV later BCWG - LMC update etc
LMC 26 Steve on the last LMC and the 3.5 TeV decision A first look at 3.5 TeV - Mike BCWG - LMC update etc
Initial operating energy of the LHC Steve BCWG - LMC update etc
3.5 TeV – prelim. Acknowledgements: Ralph Assmann Werner Herr
Intensity limit - collimation 6 e13 Ralph Assmann BCWG - LMC update etc
Intensity – collimators and beam-beam 6 e13 Ralph Assmann BCWG - LMC update etc
Limit stored energy versus beam energy Ralph Assmann BCWG - LMC update etc
Beta* - no angle Werner Herr BCWG - LMC update etc
Beta* - with crossing angle Werner Herr BCWG - LMC update etc
Crossing angle versus beta* Werner Herr BCWG - LMC update etc
Crossing angle – LRBB v. energy BCWG - LMC update etc
Peak luminosity BCWG - LMC update etc
Plugging in the numbers – 3.5 TeV BCWG - LMC update etc
Plugging in the numbers with a step in energy BCWG - LMC update etc
Step up in energy? BCWG - LMC update etc
Latest Schedule BCWG - LMC update etc
± first LHC beam BCWG - LMC update etc