An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CE267F – High-Tech Building and Industrial Construction Iris D. Tommelein, Professor www.ce.berkeley.edu/~tommelein 215-A McLaughlin Hall tommelein@ce.berkeley.edu L1&2 - Fall 2001

  2. Course Logistics • My background • Handouts • Class time and field trips • Student information sheet • Guest speakers • Individual homework • Term project in teams of 2-3 • Reading materials • Tao and Janis – textbook • e-Reader on class website www.ce.berkeley.edu/~tommelein/CE267FF01HO1.htm

  3. Construction: a Service Industry service = providing advice (knowledge) or support (skilled people) to the customer (as opposed to simply handing over a product) • 6% of workforce is employed directly in construction industry (5-6 mio workers) • expenditures over $800 billion per year in new construction (65% of work) • 7-11% of Gross Domestic Product need to concurrently design the product and the process

  4. Characteristics • One-off Projects • Complex Owner • Capital Intensive

  5. Industry Sectors • Residential 30-35% of market • Building 35-40% • Heavy Civil 20-25% • Industrial Construction 5-10% Public 25% Private 75%

  6. Feasibility & Concept Development Design Procurement Fabrication On-site Construction Turnover & Startup O&M Decommissioning Construction? • Architecture & Engineering Design • 2-10% of Project Cost • Materials • 40-70% of Project Cost • Construction • 30-60% of Project Cost MORE than design-construction integration PROJECT

  7. Objectives faster – better – cheaper productivity – quality – reliability

  8. Construction Services • Concept development and Design • Construction labor • Operations and maintenance • Manufacturing companies move into construction to deliver life-cycle solutions • Developers lease and maintain ready-to-use facilities • Financing, Legal advising, etc.

  9. Challenges • Product vs. Process • Project vs. Production • Centralized vs. Distributed Problem Solving, Decision Making, and Control • Even big construction players ... are still small • Globalization vs. local construction • e.g., engineering ‘around the clock’

  10. Faster Better Cheaper Projects are becoming increasingly challenging • Stodgy • Simple • Slow • Certain • Dynamic • Complex • Quick • Uncertain Production Task System Transactional Contracts For Delivery Organization Relational Contracts For Behavior Lean Construction Institute 1998

  11. after Lean Construction Institute 1998 The Situation • Customers demand better performance. • Projects are complex, uncertain, and quick. • Increasing % are brownfield projects (vs. greenfield) • Current management tools are appropriate for simple, slow, and certain. • Technology is changing rapidly • Increasing number of technical systems in all facilities • e.g., wired buildings for communication and environmental and safety controls • e.g., bridge and highway instrumentation • Specialty contractors know more • Suppliers are moving into design & construction • Serious problems - inadequate partial solutions • Working on the wrong problem = conceptual failure.

  12. “So complex that you have to be highly intelligent and well informed just to be undecided about them.” Laurence J. Peter

  13. Construction Management • Technical Issues • Product • Process • Contracting and Legal Issues • Economical Issues • Organizational Issues

  14. Technical Issues (mostly PRODUCT focused) • Quantitative Models • Numerous Discipline-specific Design Tools • Data exchange (integration, detailing, tolerances, …) • Qualitative Models • Databases • Decision Capture and Analysis Tools (KBES, data mining, ...) • Web-based systems for communication and collaboration, …

  15. Process Focus • Few problems are simple enough to allow for closed-form analytical solutions • Humans in the loop • Planning and Simulation • Process Models with Resource Interactions • Organizational Modeling • Product Models • Object-oriented Databases • 4 D CAD Animation

  16. Challenges • Hands-on Experience vs. Learned Theory • Engineering vs. Management • People

  17. Systems-level Theory • We have no explicit theory in the Architecture-Engineering-Construction (AEC) industry Production Management Theory is VERY Promising!

  18. Theory of Lean Production • Lean Production = Build to Order System • akin to agile mfg., mass customization, … • Conversion, Flow, and Value • Management of Uncertainties • Throughput, cycle time, buffers (handoffs between stations, time delays), etc. • Concurrent engineering, set-based design, postponed commitment, etc. • Extended to product development and delivery • Adapted for project-based production = Lean Construction

  19. Course Objectives • Focus on Specialty Contracting Industry • Impart Product Knowledge • Mechanical Systems incl. HVAC • Power generation and Electrical Systems • Plumbing and Piping Systems • Building Controls Systems • Introduce Systems-level Engineering Tools • Lean Construction • Virtual Projects • Simulation and Prototyping • Multiple participants and discipline teaming • Collaborative & Concurrent Engineering • Supply-chain Management

  20. Considerations for making Product-Process Tradeoffs • Product • Appearance, offering, purchase price, etc. • Process • Procurement availability, ease of installation, etc. TIC = Total Installed Cost • O&M • Operating cost (e.g., California Energy Crisis) • Replacement labor TCO = Total Cost of Operation • Decommissioning • Owner values  What are yours?

  21. California Energy Crisis • Deregulation • Alert levels • Stage 3 alert: power reserves fall below 1.5% of demand

  22. Building Development vs. Technological Innovation • Structural steel • Taller buildings • Elevators • Increased floor plan • Offices further from natural light • Central core has no natural ventilation/cooling • Air conditioning • Additional lighting • More heat • Fluorescent light • Lower heat generation • Lower power consumption

  23. Light Bulbs • Incandescent light bulb • Compact fluorescent lamp

  24. Compact Fluorescent Bulb From www.bulbs.com visited 8/24/01