Project Description/Team Mission Assignment

Project Description/Team Mission Assignment. Phase II Washington State University Global Health Building: Minimum 72,000 SF 5 car parking lot Connect to existing lobby of Phase I Building Loading dock

ganesa
Download Presentation

Project Description/Team Mission Assignment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Description/Team Mission Assignment Phase II Washington State University Global Health Building: • Minimum 72,000 SF • 5 car parking lot • Connect to existing lobby of Phase I Building • Loading dock • Our goal as a team is to create a final design report by combining our knowledge and experience in the civil engineering field.

  2. Team Member Identification/Responsiblities KaylorHasbargen: • structural aspects of the project. • modeling the building and performing the necessary calculations • team representative when contacting KPFF consulting engineers Chris Reynolds: • assisting with the structural aspects of the project and other drafting aspects of the project • communications and time management for the group

  3. Chad Lawrence: • Creating the civil site plans • Monitoring any environmental impacts of construction • Assisting with getting LEED certification Mathew Colling: • Stormwater design for the site following the standards from the Eastern Washington Stormwater Manual • Insure that the building receives LEED certification

  4. Measures of Success • The usefulness of the Project to KPFF Consulting Engineers • Quality of final design report • Potential reduction of cost for KPPF Consulting Engineers

  5. Boundaries/Operating Guidelines • Design for the new building and all of the civil site work plans for Phase II • Responsible to produce the Final Design Report • Bi-weekly submission of timesheets and memos • Communication for the team will primarily take place over email, text, and in person. • Weekly meetings scheduled after our labs • Conflict management will take place during the weekly team meeting and will first be handled within the group.