ADDRESSSING THE ISSUE OF HIGH VOLTAGE. Action taken to control High Voltage. Closing of Bus and Line Reactors Changing of Transformation Tap Position Export to WR/ER Region Optimisation of HVDC Set Points Var absorption by Generators Switching – off of Capacitors. ISSUES OF CONCERN.
E N D
Action taken to control High Voltage • Closing of Bus and Line Reactors • Changing of Transformation Tap Position • Export to WR/ER Region • Optimisation of HVDC Set Points • Var absorption by Generators • Switching – off of Capacitors
ISSUES OF CONCERN STILL HIGH VOLTAGES IN SOME AREAS
ONE CKT OF 400KV TALAGUPPA-NELAMANGALA LINE OPENED OUT ON REGULAR BASIS TO CONTAIN OVER VOLTAGE. • 400/220 KV TALAGUPPA ICT TAP POSITION AT 9 RESULTING IN • 400KV BUS VOLTAGE @ TALAGUPPA IS AT 431KV WHILE 220KV BUS VOLTAGE @ SHARAVATHY IS AT 219KV • OPENING OF ONE CKT OF 400KV TALAGUPPA-NELAMANGALA DROPS THE 400KV VOLTAGE BY 7 – 9 KV. • CHANGING THE TAP TO 11 WOULD BRING DOWN 400KV VOLTAGE BY 4 – 6 KV & CORRESPONDINGLY 220KV VOLTAGE WOULD ALSO RISE. HIGH VOLTAGE PROBLEMWESTERN PART OF KARNATAKA Graphs Map Kar GRAPH kAIGA