140 likes | 309 Views
FFMP Improvements OB8.3 and OB9. Ernie Wells National Flash Flood Services Program Leader Hydrologic Services Division Office of Climate, Water and Weather Services. CBRFC SH Call May 29, 2008. FFMP Improvements (QPE/QPF Improvements). Outline.
E N D
FFMP ImprovementsOB8.3 and OB9 Ernie Wells National Flash Flood Services Program Leader Hydrologic Services Division Office of Climate, Water and Weather Services CBRFC SH Call May 29, 2008
FFMP Improvements (QPE/QPF Improvements) Outline • High-resolution Precipitation Estimation (HPE) (AWIPS OB8.3) • High resolution rain rate and precipitation accumulation grids • spatial resolution 1/4 HRAP mesh length (~1x1 km) • Update frequency configurable up to 5 minute intervals • DHR used to create radar rain rate estimates • Gages are NOT used in this version of EMPE, however the MPE gage-radar bias table can be used in rain rate and accumulation estimation • Dual Polarization DPR NOT used in this version of EMPE
FFMP Improvements (QPE/QPF Improvements) Outline • High-resolution Precipitation Nowcaster (HPN) (AWIPS OB9.0) • An extrapolative forecast of the reflectivity field valid for the next hour, updated every 15 minutes on an HRAP grid. Additional fields for AWIPS display include: • 1-hour radar precipitation accumulation forecast (with and without bias correction) • Instantaneous rain rate forecasts at 15 minute intervals out through 1-hour (with and without bias correction) • RFC MPE Mean Field Bias to WFO (AWIPS OB8.2) • WFO operators can select which RFC bias message to receive and which bias message to send to the RPG • NMQ/Q2 infusion into NCEP (no targeted build) • Probabilistic QPE (no targeted build)
FFMP Improvements OB8.3 Improvements Outline • Ingest gridded data (QPE, QPF, and guidance)
FFMP Improvements OB8.3 Improvements Outline • Attribute Inclusion in the Basin Trend Table
FFMP Improvements OB8.3 Improvements Outline • Split Window QPF
FFMP Improvements OB8.3 Improvements Outline • On the fly CWA coverage
FFMP Improvements OB8.3 Improvements Outline • Enhanced Basin Trend
FFMP Improvements OB8.3 Improvements Outline • Site Controlled Time Window Maximum • Uses purge value from AWIPS Intelligent Purger • Increase in number of monitor sites • From 3 to 5 • Localization containment • Separate from SCAN • Enhanced Displaced Real-Time (DRT)
FFMP Improvements OB9 Improvements Outline • Fixed Duration Basin Trend Graphs
FFMP Improvements OB9 Improvements Outline • Fixed Duration Basin Trend Graphs
FFMP Improvements OB9 Improvements Outline • FFG Updating
Must obtain, customize and VERIFY new domain based small basin files Improving Flash Flood Services WarnGen OB8.3 Outline • FFMP Basin names in WarnGen
FFMP ImprovementsOB8.3 and OB9 Thank you! Any Questions? CBRFC SH Call May 29, 2008