Pipe2000 Campus Facilities Modeling by Dr. Don J Wood

Easily model pipe systems with the Pipe2000 GUI for all campus modeling projects. Create hydraulic models using the UltraEasy GUI for steady and transient modeling.

gaskin
Download Presentation

Pipe2000 Campus Facilities Modeling by Dr. Don J Wood

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pipe2000 Campus Facilities Modelingby Dr. Don J Wood Pipe2000 Modules

  2. Pipe2000 GUI • The GUI (Graphical User Interface) determines how efficiently the user can utilize the software. • Pipe2000 GUI only for pipe system modeling • Extremely easy to use • The same for all Campus Modeling projects

  3. Creating a Hydraulic ModelUsing the UltraEasy Pipe2000 GUI(for steady and transient modeling) • Backgrounds • Laying out Pipe Systems • Providing data • Hydraulic Calc. • Labeling your Pipe System

  4. Pipe2000 Backgrounds Subdivision Drawing (DXF)

  5. Pipe2000 Backgrounds Piping Drawing (JPG)

  6. Campus Map (scaled)

  7. Laying Out Your Pipe SystemAs Easy as 1-2-3 • (1) Left Click (LC) to select existing node (or pipe) • (2) Select first node – move mouse and Right Click (RC) to add Pipe and Node • (3) Select Node and use Dropdown List to change Node Type

  8. Laying Out Your Pipe System Move mouse 1) Move mouse to next location

  9. Laying Out Your Pipe System RC 2) Right Click to add Pipe

  10. Laying Out Your Pipe System Move mouse LC 3) Select new starting node (Left Click)

  11. Laying Out Your Pipe System 4) Move to next location and Right Click

  12. Change Node Types LC LC 1) Select node (LC) and select Type (Pump) from Dropdown List

  13. Change Node Types Node is changed to Pump

  14. Change Node Types Node Type changes complete – Enter Data for each Pipe and Node

  15. Entering Pipe Data Length-- scaled • Select pipe and 2) choose Pipe Type 3) data entered 4) select fittings • Pipe Type button from list automatically from Fittings List One Click and Select Pipe Type can Provide Required Pipe Data

  16. Enter Node Data Pump Data – multiple pumps variable speed pumps Tank Data – fixed diameters various shapes --- max level --- min level

  17. Hydraulic Analysis and the Report

  18. Hydraulic Analysis and the Report

  19. Labels for Data and Results Use Label Menu for other selections Fonts, etc

  20. Pipe2000 Campus Facilities Modeling Examples • Potable Water Distribution & Fire Flows • Chilled Water – supply & return • Hot Water Distribution • Gas Distribution • Steam Distribution saturated superheated

  21. Example Campus Facilities Modeling – Campus Map Use Map as Scaled Background Map For Pipe2000 Models

  22. Potable Water Distribution Model • Supply from City Water System 90 psi static, 75 psi residual @ 2000 gpm • Average Demands for Each Building • Peak Demands for Each Building (GDF=1.4) • Fire Flow at Average Demands • Fire Flow at Peak Demands

  23. Laying out Water Distribution Model LC(4)- RC(2) RC(1) RC(5) Location of City Water Main RC(3) Showing first 5 mouse clicks used to develop Pipe2000 model

  24. Potable Water Distribution Model Demand Locations Fire Hydrant

  25. Pipe Data for Potable Water System

  26. Pressures @ Average Flow (1125 gpm)

  27. Pressures @ Peak Flow (GDF-1.4)

  28. Fire Flow @ 20 psi Minimum (average)

  29. Fire Flow @ 20 psi Minimum (peak)

  30. Chilled Water Model Chillers & Pump Flow Control Valve Sets suction pressure Supply Return Main pipes = 6 in. Buld. Pipes = 4 in. HW C = 140

  31. Modeling Chilled Water System Loads If supply side pressure at the flow control valve is not sufficient the flow control valve will open wide and provide less flow which can be accommodated by the return side Flow Regulators simulate valves which control the flows to buildings Supply side Hydraulics determines the pressure available at the building Return side Hydraulics determines the pressure required at the building to transport water back to pump & chillers

  32. Results – Peak and Average Loads Peak Load Unable to maintain load Average Load

  33. Pressures – Average Loads

  34. Can We Add a New Building?You can evaluate in 3 minutes New 4 inch Supply Piping New 4 inch Return Piping OK!

  35. Hot Water Distribution System Supply: 450 F @ 200 psi Roughness = 0.3 millifeet Average Building Load = 8 gpm

  36. Pressures – Load = 8 gpm

  37. Pressures – Load = 14.4 gpm

  38. Pressures at Selected Buildings 8 gpm 14.4 gpm

  39. Hot Water Model – Tabulated Results

  40. Pipe2000 Natural Gas Distribution 2 inch pipe 4 inch pipe Pressure Supply (120 psi) Roughness = 0.02 millifeet Average Building Load = 300 MSCF/day

  41. Gas Model Details Load to Building (300 MSCF/day) Pressure Regulator Setting = 40 psi Connection to Gas Main Pressure Supply @ 120 psi Pressure Regulator Setting = 30 psi

  42. Gas Distribution Model Data Gas2000 System Data Pipe2000 Help for Gas Properties

  43. Gas Pressures at Buildings

  44. Tabulated Results – Gas Analysis

  45. Steam Distribution System Steam Plant 100 psi Roughness = 0.01 millifeet Average Building Load = 400 #/hr

  46. Modeling Steam Distribution • Saturated Steam Analysis 1) plant provides saturated steam @ 100 psi 2) saturated steam is distributed to all buildings 3) Load increases from low (400 #/hr) to high (800 #/hr) • Superheated Steam Analysis 1)plant provides superheated steam @ 100 psi and 450 degrees F 2) heat loss calculated using heat transfer coefficient = 0.15 3) select “Temperature Sensitive Analysis”

  47. Pressures (400 #/hr)

  48. Pressure @ 720 #/hr

  49. Pressures at Selected Buildings

  50. Pressures at Selected Buildings 400 #/hr480 560 640 720 800