60 likes | 137 Views
WP6 Conclusions. WP6 relation with other WPs. WP2: Use Cases. addressing needs of. based on. WP6. populated with. WP5: Knowledge Resources. delivered through. Scenarios. WP4: TenCompetence Pilots. using. using. Tools. WP3: Communication and Collaboration Services.
E N D
WP6 relation with other WPs WP2: Use Cases addressing needs of based on WP6 populated with WP5: Knowledge Resources delivered through Scenarios WP4: TenCompetence Pilots using using Tools WP3: Communication and Collaboration Services Specifications for connection with
WP6 Internal Structure connected with T3: Assessment Model T1: Units of Learning assessed through use played in designed with T2: Authoring Tools T2: Runtime Engines T6: UoL Quality Rating use validated through validated through T5: Usability Test T4: Services Connection Protocol
WP6 18M Open Issues • Units of Learning (Scenarios) • Bridge with WP4 TenCompetence Pilots UPF • Bridge with WP5 Knowledge Resources Giunti • Connection Protocol • Bridge with WP3 Services WHO + HOW? • Bridge with WP5 Tools Giunti
WP6 Action Plan until Jan. Meeting • Each partner approve: • distribution of effort across WP6 tasks • Each partner prepare: • description of 18m work for each task • a short presentation on WP6 involvement • OUNL: • Prepare a briefing document on the Assessment Model (open problems and/or problems occurred) • UPF (as WP4 Leaders): • Prepare a briefing document for discussion on the Units of Learning (Scenarios) requirements for the TenCompetence pilots • CERTH: • Prepare an analytic task plan and timetable for 1st Year WP6 activities with issues to be investigated, analyzed and solved