1 / 6

WP6 Railway Demonstrators

WP6 Railway Demonstrators. TRSS Demonstrator Werner Schütz, Thales Rail Signalling Solutions. WP6 Railway Demonstrators - Objectives. General WP6 Objectives: to demonstrate applicability of model-based test case generation for applications in the railway interlocking sector

palma
Download Presentation

WP6 Railway Demonstrators

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP6Railway Demonstrators TRSS Demonstrator Werner Schütz, Thales Rail Signalling Solutions

  2. WP6 Railway Demonstrators - Objectives • General WP6 Objectives: to demonstrate applicability of model-based test case generation for applications in the railway interlocking sector • For reporting period: preparation of demonstrator setup

  3. WP6 / TRSS - Progress Selection of demonstrator configuration Existing test stations for train route tests(HMT, LBT) Enables comparison with existing test cases Minor data modifications to be in line with the requirements used in MOGENTES No elements modifying the allowed speed Simplified flank protection Finished in November 2009 Demonstrator up and running with these configurations → Demo

  4. WP6 / TRSS - Deviations Decision not to buy new equipment for MOGENTES Pursue solution involving virtualization No new solution from scratch was developed. Existing prototypes were put together. Budget used for personnel costs instead of material

  5. WP6 / TRSS - Deviations

  6. WP6 / TRSS - Planning Demonstrator is finished and ready to run generated test cases For stress tests, we will use test equipment with real HW from our lab (as used in the field).

More Related