190 likes | 368 Views
R/T Update. Ron Yurko R/T Business Unit Manager Powerex. Most Powerful Alliance. General Electric Co. Leading manufacturer in power semiconductors and power modules. Leading manufacturer in power electronics and applications engineering. Together they formed the most powerful alliance
E N D
R/T Update Ron Yurko R/T Business Unit Manager Powerex Powerex Proprietary
Most Powerful Alliance General Electric Co. Leading manufacturer in power semiconductors and power modules. Leading manufacturer in power electronics and applications engineering. Together they formed the most powerful alliance in the power-electronics field in the USA.
Product Groups Rectifier & Thyristor Diamond Power IGBT & IPM Modules Integrated Power Products Custom Modules
Power Semiconductor Device Evolution Discrete Assemblies Module Assemblies Complete Power System Standard & Application Specific SCR / Diode / GTO Discretes Powerex Pow-R-Pak SCR / Diode Modules BJT / MOSFET Discretes Darlington Transistor / MOSFET / IGBT Modules Intelligent IGBT Modules (IPM) Application Specific IPM Gate Drive & Protection Integrated High Power System Electrical Isolation Integrated Low Power System in a Module Power Switch
R/T Update & Manufacturing Expansion Ron Yurko Powerex Proprietary
Silicon Chip Processes • Planar Diode & Bipolar Transistor • Mesa Diode, Transistor & SCR
5 robots added in 2010 Powerex Proprietary
Steel City Grant in Progress Powerex applied for and was awarded a $8,000,000 DOE Grant to build a factory for medium volume module production in support of electric vehicle stimulus plans. Powerex will build a new clean room housing a manufacturing center, reliability center and lab. Mitsubishi and GE agreed to support with a remodel of the existing factory. The first floor will be the location of the new facility. The 2nd floor will be consolidated for continued discrete element fabrication. Acoustic Microscope and SEM used for failure analysis & yield improvement added in 2010 as a result of this grant. ($500,000) Powerex Proprietary
Tangiers • Off shore capacity will enable flexibility to meet demands & ability to vertically integrate future processes • Beach head into Europe Powerex Proprietary
International Plans for 2010 • Sand Factory begins in Q4 2010
Business Segments Business Center 1 Business Center 2 Morocco
PWRX Tangiers Team PowerexConfidential
Blok Assembly Line PowerexConfidential
Disc Assembly Line PowerexConfidential