1 / 1

Liberty Point International School 2012 Proposed Bond Projects

Liberty Point International School 2012 Proposed Bond Projects. Front Entrance Security Enclosed vestibule to control access to the school. Clear line-of-sight from office to entry doors and approach. Doors electronically controlled by office staff. Card-swipe keyless entry system.

gay-morrow
Download Presentation

Liberty Point International School 2012 Proposed Bond Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Liberty Point International School2012 Proposed Bond Projects • Front Entrance Security • Enclosed vestibule to control access to the school. • Clear line-of-sight from office to entry doors and approach. • Doors electronically controlled by office staff. • Card-swipe keyless entry system. • ADA compliant door hardware and entry systems. • Six Classroom Addition &Restrooms • Eliminate modular classrooms • Provide a secure 21st Century learning environment • Security Fencing • Roof Repairs, Restroom Renovation & Fixture Replacement, Air Condition the Gym 6 Classroom Addition Eliminates Modulars Renovation of Current School Restrooms Secure Entrance

More Related