1 / 15

Termiticide: Method of Application

Termiticide: Method of Application. Termite Control : Principles. Basic principle of termite control is to deny moisture source : lack of moisture leads to desiccation of the termites. Create a barrier so that the termites cannot reach

gaymaria
Download Presentation

Termiticide: Method of Application

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Termiticide: Method of Application

  2. Termite Control : Principles • Basic principle of termite control is • to deny moisture source : lack of moisture leads to desiccation of the termites. • Create a barrier so that the termites cannot reach • No good physical methods / barriers are available for curtailing the infestation of the termites • The most common barrier is use of chemicals • Chemical barriers are proved to last for a long time provided : • The chemical has good termiticidal property • The timing of application: Pre construction is always better than Post construction application.

  3. Termite Control : Methods of Application Two types of application are very common • Pre construction • Post construction

  4. Why Preconstruction Treatment is Preferred? • Ease of application • Thorough coverage; Complete Barrier • Long lasting effect of termiticide • Peace of Mind

  5. Treatment for Masonry Foundations & Basements

  6. STEP : 1 : Bottom and sides of trenches After digging the pit Treat bottom surface & sides of excavations made from masonry foundation & basements P I T Treat with Biflex to a height of 300 mm 300 mm At a dose rate of 5 lt / m2 Biflex

  7. STEP : 2 : Backfill in Immediate contact with foundation wall STEP 2 After masonry foundation & the retaining wall of the basement is built Back fill earth STEP 2 The backfill in the immediate contact with the foundation to be treated with Biflex STEP 2 STEP 1 Treat Biflex @ 7.5 lt / m of the vertical surface of the sub structure for each side STEP 1 Lot of voids are seen in this type of foundation, hence the entire foundation require to be completely enveloped with Biflex Biflex

  8. Top surface STEP : 3 : Top Surface & Plinth filling STEP 3 The top surface of the consolidated earth within plinth walls shall then be treated Back fill earth Back fill earth Treat Biflex @ 5 lt / m2 of the surface before the sand bed or sub-grade is laid STEP 2 If the filled earth is rammed and the surface does not allow the emulsion to seep through, the make holes upto 50 to 75 mm deep at 150 mm centres to facilitate saturation of the soil with emulsion STEP 2

  9. Top surface STEP : 4: Junction of wall & floor The junction of wall and floor should be treated with chemical barrier on inner wall surface from ground level STEP 3 Back fill earth Back fill earth STEP 4 Treat Biflex @ 7.5 lt / m of vertical wall or column surface to be used so that it soaks the soil upto the bottom STEP 2 STEP 2

  10. Consolidated Procedure : Masonry Foundation STEP 3 Apron STEP 4 Ground Level Perimeter STEP 2 Treat perimeter of the Building @ 7.5 l/ m and soil below the Apron @ 5 l / m2 STEP 1

  11. Treatment for RCC Foundations & Basements

  12. Treatment for RCC foundations & basements • In RCC foundations the concrete is dense( 1:2:4), hence termites are unable to penetrate the structure. • Therefore it is unnecessary to start the treatment from the bottom of excavations. • The treatment for RCC construction should start from a depth of 500 mm below the ground level except when the ground level is raised or lowered. • If the ground level is raised or lowered – then depth of 500 mm should be determined from the new soil level • The vertical structure of the RCC foundations shall be treated at the rate of 7.5 l / m (similar to Step 2 of Masonry foundations) Back fill earth

  13. Consolidated Procedure : RCC Foundation Step 2 : Top surface and plinth filling @ 5l/ sq m Step 3 : Junction of Wall & floor STEP 1 Perimeter Treat Biflex – 500 mm from ground surface Treat perimeter of the Building @ 7.5 l/ m

  14. Factors Effecting The Efficacy Back fill earth • Choice of chemicals • Dosage of the chemical used while applying • Coverage of the spray fluid

  15. Thank You

More Related