An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDYOhio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003

  2. SYSTEMOVERVIEW

  3. Ohio and Lake Erie Regional Rail Cleveland Hub An 860 mile rail system with 32 Stations. Serving 22 million people in 24 cities and towns.

  4. Study Goals and Objectives • Forecast system ridership and revenue • Estimate operating and maintenance costs • Evaluate inter-modal connections with airports

  5. Study Goals and Objectives • Analyze alternative routes • Examine synergies with other corridors • Incorporate into the State Transportation Plan Access Ohio • Apply for FRA High Speed Rail Designation

  6. Part of an International Rail Network

  7. Part of an International Rail Network

  8. Railroad Objectives • Provide opportunities for and encourage railroad input in the planning process. • Be sensitive to the railroad’s needs for capacity and future growth. • Expand railroad capacity while improving the fluidity of railroad operations.

  9. Infrastructure and Engineering Objectives • Keep railroads whole • Expand capacity (mainlines, sidings, yards, bridges) • Improve fluidity and reliability • Eliminate bottlenecks; decrease train travel time; and increase train speeds • Examine three investment scenarios (design speed) • 79 mph; 90 mph; 110 mph (Top Speed of 125 mph) • Improve safety and grade crossing warning systems • Capital costs and improvement concepts are based on field observations by HNTB and Amtrak

  10. Talgo Flexliner Acela Gas Turbine Modern Equipment Technology

  11. KEY TECHNICAL FINDINGS

  12. Findings • Significant Regional Travel Market and Potential for Intercity Rail. • Strong Ridership Estimates. • System Benefits from Connectivity. • Competitive Travel Times with the Automobile. • Regional Economic Benefits.

  13. Strong Potential Market for Passenger Rail

  14. System Hub Total with Modern Technology (Option 1, Max. speed at 110-mph) Ridership Passenger Revenue 4.120 M $176.973 M Cleveland-Detroit Ridership Revenue 1.763 M $43.756 M Cleveland-Buffalo- Toronto Ridership Revenue 0.688 M $29.749 M Cleveland-Columbus- Cincinnati Ridership Revenue 1.834 M $78.331 M Cleveland-Pittsburgh Ridership Revenue 0.786 M $25.036 M 2025 Ridership and Revenue Forecast

  15. Travel Time Summary

  16. Estimated Fares Between Stations

  17. Possible Implementation • EIGHT TO TEN YEAR IMPLEMENTATION (Assumes Federal Funds) • START-UP SERVICE: 79 MPH, 2-3 Trains per day (2 to 5 Years) • 1. Cleveland – Columbus – Dayton - Cincinnati • 2. Cleveland – Detroit • 3. Cleveland – Pittsburgh • 4. Cleveland – Buffalo – Toronto • FULL SERVICE: 110 MPH, 6-8 Trains per day (5 to 10 Years) • 1. Cleveland – Columbus – Dayton - Cincinnati • 2. Cleveland – Detroit • 3. Cleveland – Pittsburgh • 4. Cleveland – Buffalo – Toronto

  18. Preliminary Economic Impact • Jobs Created • 16,000 temporary construction jobs created • 300 full-time operating jobs created • 2,000 indirect job benefits • Property Value Increases • Approximately $1 billion increase in Ohio property values. • Income • Annual income increased by $256 million • Annual tax revenues increased by $28 million

  19. Next Steps • Complete Federal Railroad Administration Study of Track Maintenance Costs and incorporate results into the Cleveland Hub financial and economic analysis.

  20. Next Steps • Distribute draft report to railroads and steering committee for comment. • Build support at the local, state, and national levels (Ohio program) • Hold public outreach meetings. • Hold meetings with the business community.

  21. Next Steps • Conduct detailed Economic Impact Study. • Initiate ODOT Environmental and Project Development Process. • National Environmental Policy Act (NEPA) Process • First 4 Steps of ODOT’s Major Project Development Process.

  22. Passenger Rail Investment Reform Act of 2003 • Proposed by USDOT. • Removes Amtrak from the discussion of how to improve passenger rail service in the U.S. • Places responsibility for passenger rail development in the hands of the states and federal government. • Reduces Amtrak’s role to that of a service provider.

  23. Passenger Rail Investment Reform Act of 2003 • Envisions a national system of interconnected corridors, rather than a network of long distance trains. • Is consistent with Ohio’s corridor planning. • Recognizes the real cost of access to railroad tracks and railroad property.

  24. Other Proposed Federal Bills • S. 1505, The American Rail Equity Act of 2003, (AREA) • HR 2571, Rail Infrastructure Development and Expansion Act for the 21st Century, (RIDE-21) • ARRIVE-21, To be introduced soon. • Rail infrastructure investment bills: H. 1617, HR 2192, HR 876,