An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tripped Muon chambers 12.11.10 Oleg Maev 1

  2. Map of tripped/trained gaps/chambers Status on 12.11.10 12.11.10 Oleg Maev 2

  3. Winter shutdown. List of chambers have to be replaced by spares: CAEN 2527: At present, we have two negative boards, can be increased up to six. There are 17 of A1833N in EP, but no one is available. Have to negotiate with holders. Cables/connectors have to be prepared. 12.11.10 Oleg Maev 3

  4. Testing/conditioning in b.156, GIF 12.11.10 Oleg, Nikolay, Mario, Massimo 4

  5. 48V CAEN modules problem Yesterday we discovered that both of 48 power supplies (A3485) have faulty cooling fans. On A-side – four from five – Nikolay has replaced it by spare already On C-side – two from five But it seems too much, it was really dangerous? 12.11.10 Oleg, Nikolay 5