An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OP day 2008 Problems and worries Pole Face Windings of the PS Pierre Freyermuth

  2. Topics • Introduction • New PFW supplying • Operations mechanism • 2007 Objectives • Initially start with 3 current mode but… • Commissioning • Write the adjustment software • Measuring matrix current/parameter • 2007 Worries • Power converters limitation discovery • Qmeter worries • 2007 Performed Work • Measurements and tests on PFW power converters • A first version of the adjustment software • Some point of the matrix are done • 2008 Objectives • Start-up with calculated matrix from the 3 current mode • Consolidation of PFW software • Re-validate power converters with new improvements • Measuring matrix • Acknowledgements OP day - Pierre Freyermuth

  3. Introduction • New PFW supplying : From 3 to 5 currents, new magnetic possibilities. OP day - Pierre Freyermuth

  4. Introduction • New PFW supplying : new adjustment strategy. • We have the possibility to adjust 5 currents to control 4 parameters. • A fifth parameter can be Q’’ or the less RMS current. OP day - Pierre Freyermuth

  5. Introduction • Operation mechanism OP day - Pierre Freyermuth

  6. Introduction • Operation mechanism The Matrix is: Polynomials define the behavior of Qh, Qv, h, v as a function of current in DN, DW, FN, FW, 8L. Fesa Class is used to store it. OP day - Pierre Freyermuth

  7. 2007 Objectives • Initially start with 3 current mode but… After the Cold check-out measurements, it was decide to keep the 5 currents mode. • Commissioning Test, measure and validate to the 2008 start-up • Write the adjustment software A software to be able to control tune and chromaticity. Imply to determine different new scenarios and re-write the previous application. • Measuring matrix current/parameter Use a special cycle for measurements, a multi flat-top one or separated cycles. OP day - Pierre Freyermuth

  8. III. Worries • Power converters limitations discovery: The 2007 run history. April Mai June July August 5 3 5 3 5 Start-up Shut Down Many changes between 3 to the new 5 currents mode occurred. OP day - Pierre Freyermuth

  9. III. Worries April Mai June July August • Power converters limitation discovery: 5 3 5 3 5 • At the beginning, induced currents from B field was not well compensate. • New samplers available, but with data worries. • We observed problems with the East Spills. • Adjustment of balance resistors between pair and odd windings. • Power converters started to be unstable. • We decided to return back in 3 currents mode the 15th of may. OP day - Pierre Freyermuth

  10. III. Worries April Mai June July August • Power converters limitation discovery: 5 3 5 3 5 OP day - Pierre Freyermuth

  11. III. Worries April Mai June July August • Power converters limitation discovery: 5 3 5 3 5 • Back to 5CM, but still with induce currents. • Worries with GFA. • Many works done to improve the Dirac spill, not really successful. • Hybrid test, with new converters except the 8 loop. • The Multi-Turn Extraction was nearly impossible, whereas good in 3CM. • Back to 3CM to measure tune and East spill, in order to underline the difference of beam quality. OP day - Pierre Freyermuth

  12. III. Worries April Mai June July August • Power converters limitation discovery: 5 3 5 3 5 Dirac Spill 5CM Dirac Spill 3CM OP day - Pierre Freyermuth

  13. III. Worries April Mai June July August • Power converters limitation discovery: 5 3 5 3 5 • Back to 5CM, after lot of works from PO team. Among others, the synchronization of acquisitions and regulation loop was improve. • Dirac experiment observed a better spill than the 3CM. • MTE islands in 5CM. • But still a “transition” error around 40A. OP day - Pierre Freyermuth

  14. III. Worries April Mai June July August • Power converters limitation discovery: 5 3 5 3 5 3CM 5CM Dirac Spill after averaging. OP day - Pierre Freyermuth

  15. III. Worries April Mai June July August • Power converters limitation discovery: 5 3 5 3 5 40A instabilities during 2007 run. Nowadays PO team found the solution. OP day - Pierre Freyermuth

  16. III. Worries • Q meter • The BBQ front-end installed and connected to the old acquisition system. • Measurements was impossible with an excursion more than 10mm. OP day - Pierre Freyermuth

  17. III. Worries • Q meter The most important impacts were • The impossibility to measure non-linear chromaticity. • Lot of points of the matrix is missing. • Q meter is an important tool for operation. OP day - Pierre Freyermuth

  18. 2007 Performed Works • Measurements and tests on PFW power converters • Lots of tests were made, with impacts on the physic run. • PO team brought PFW power converters to our requirements. • A first version of the adjustment software • Initialization, adjustments, measurements and validation system work. • Some adjusment scenarios was found. • Some point of the matrix are done • 14 GeV/c • 3,5 GeV/c • 26 GeV/c (From 2004 measurement). • BBQ measurement was improved until the end of the run OP day - Pierre Freyermuth

  19. 2008 Objectives • Start-up with a calculated matrix and the virtual 3 current mode. • Consolidation of PFW software. • Re-validate power converters with new improvements. A new DSP to avoid 40A ripple and reduce delays. • Validate tune measurements BBQ and old system • Measuring matrix. OP day - Pierre Freyermuth

  20. Acknowledgements • Bernard Vandorpe • Simone Gilardoni • Rende Steerenberg • Jean-Paul Burnet, Olivier Michels And The PO team • MarekGasior and the BI team • All people imply in this project OP day - Pierre Freyermuth

  21. OP day 2008Problems and worries Pole Face Windings of the PS Pierre Freyermuth \\cern.ch\dfs\Users\p\pfreyerm\Public\Problems and worries PS.pptx