ATLAS Upgrade Closed session Introduction

ATLAS Upgrade Closed session Introduction. Zdenek Dolezal. Participants. AU management (P. Allport , S. McMahon, I. Gregor ) Charles U. (Z.D.,P. Kodys , I. Chalupkova , P. Kubik , J. Broz, R. Leitner ) CTU FNSPEC (M. H avranek , M. Marcisovsky )

geoff
Download Presentation

ATLAS Upgrade Closed session Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATLAS UpgradeClosed session Introduction Zdenek Dolezal AU: afternoon

  2. Participants • AU management (P. Allport, S. McMahon, I. Gregor) • Charles U. (Z.D.,P. Kodys, I. Chalupkova, P. Kubik, J. Broz, R. Leitner) • CTU FNSPEC (M. Havranek, M. Marcisovsky) • CTU IAEP (S. Pospisil, M. Solar, K. Smolek) • IoP (V. Vrba, M. Mikestikova, A. Kupco) • UWB Pilsen (S. Moravka, D. Tolar) • Companies: Argotech (J. Kubelka, Ing. Kratochvil), On-Semi AU: afternoon

  3. ITK and the Prague cluster • Investigate possibility to set up one production unit of the ITK endcap modules in Prague • Significant extension of the ATLAS tasks: • 2003-5: sensor QA, QA of 400 modules, pixels • ?2017-19?: sensor QA, assembly + wire bonding + QA of ~1000 modules • Main discussion topic for the afternoon AU: afternoon

  4. Necessary conditions • Infrastructure • Clean rooms, vacuum jigs, bonding, cooling, metrology • Test systems (HV,LV, R/O) • Personnel • Engineers for the production implementation and control • Technicians • Physicists/students for testing, database… AU: afternoon

  5. Necessary conditions Financial support • Local: equipment, operation, travels, salaries – limited term contracts • Contribution to the detector Common Fund AU: afternoon

  6. How can our guests help us today? • They cannot help us with the Czech financial support – I propose we do not discuss this • We want them to tell us what they expect • Definition of the tasks needed • Environment and infrastructure • Timing • Participation in the tools and methods design AU: afternoon