220 likes | 377 Views
CIGRE Study Committee B3 “Substations”. Prepared by Wolfgang Degen B3-AA2 Hanna Abdallah. Modern substation technology CIGRE SC B3 “Substations”. CIGRE Study Committee B3 “Substations” Scope:
E N D
CIGRE Study Committee B3“Substations” • Prepared by Wolfgang Degen B3-AA2 • Hanna Abdallah Modern substation technologyCIGRE SC B3 “Substations”
CIGRE Study Committee B3 “Substations” Scope: Study Committee B3 is responsible for the design, construction, maintenance and ongoing management of substations and the electrical equipment in power stations, excluding generators. It serves a broad range of target groups in the Electric Power Industry whose interests cover technical, economic, environmental and social considerations in varying degrees
Modern substation technologyCIGRE SC B3 “Substations” • Number of represented countries: 36 • 24 Members and 12 Observers • Number of working groups: 14 • Number of advisory groups: 4 • Annual meetings since 2002: 2002 Paris • 2003 Utrecht* • 2004 Paris • 2005 Tokyo* • 2006 Paris • 2007 Berlin* • 2008 Paris • 2009 Capetown* • * Colloquium, Tutorial and Panel
Organizational Diagram of CIGRE Study Committee B3 June 2007 2007 SC Chairman A. Wiersma Customer Advisory Group G. Breen Strategic Advisory Group (includes 5 Area Advisors) A. Wiersma Tutorial Advisory Group F. Besold SC Secretary C. Counan Co-operation Group B3/B5/A3 F. Baldinger Area Advisors (AA) and Working Groups Study Committee 24 Regular Members, 12 Observer Members, 1 Special Reporter, all WB Convenors AA1 Substation Concepts and Developments H.-E. Olovsson AA2 Gas Insulated Substations W. Degen AA3 Air Insulated Substations A. Sahazizian AA4 Substation Management J. Smit AA5 Secondary Systems F. Baldinger B3.06 Substation Management TF 04 Replacement TF 05 Info Strategy J. Smit B3.01 Substation Concepts Hans Erik B3.10 Primary/Secondary System Interface Modelling for Total Asset Performance F. Baldinger B3/B1.09 Application of Long High-Capacity GIL in Structures H. Koch B3.15 Cost Reductions of Air Insulated Substations K. Kawakita B3.11 Combining Innovation with Standardization J. Finn B3.17 Residual Life Concepts Applied to HV GIS K.Pohlink B3.21 Turnkey Substations A.-M. Sahazizian B3.12 Obtaining Value from Substation Condition Monitoring A. Mackrell B3.18 SF 6 Tightness Guide P.Glaubitz B3.13 Reducing replacement time of HV equipment F. Gallon B3.20 Mixed Technology Switchgear W. Degen B3/C1/C2.14 Circuit Configuration Optimization G. Lingner B3.22 UHV Substations T. Yokota Organisational diagram of CIGRE SC B3 “Substations”
Modern substation technologyCIGRE SC B3 “Substations” SAG (Strategic Advisory Group) The objective of the Strategic Advisory Group is to support the SC Chairman in order to :■optimize the organization to the changing environment ■ suggest contributions/presentations by SC members and working groups for events ■ regularly update the committee’s strategic plan
Modern substation technologyCIGRE SC B3 “Substations” CAG (Customer Advisory Group) The CAG aims are: ■ Identify opportunities to increase customer satisfaction; ■ Collect feedback from customers, suggest work and preferential subjects; ■ Develop concepts for improved customer information and support implementation.
Modern substation technologyCIGRE SC B3 “Substations” The CAG aims are: ■ Identify opportunities to increase customer satisfaction; ■ Collect feedback from customers, suggest work and preferential subjects; ■ Develop concepts for improved customer information and support implementation.
Modern substation technologyCIGRE SC B3 “Substations” TAG (Tutorial Advisory Group) The general objective of the TAG is to advise the Study Committee and its Chairman on the implementation of CIGRE policy in relation to tutorials .
Modern substation technologyCIGRE SC B3 “Substations” AA1 Substations Concepts and Developments” The advisory area covers the whole substation in a system approach as nodes of optimal power systems. The main directions outlined in the Strategic Plan should guide the activities related to AA1. The technical, environmental and economical aspects related to substation concepts, should be an integral part of the activities. • WG B3.11: Combining Innovation with Standardization. • B3.12 Obtaining Value from Substation Condition Monitoring • WG B3.13 Reducing Replacement Time of High Voltage Equipment. • WG B3-C1-C2.14 Circuit Configuration Optimization
Modern substation technologyCIGRE SC B3 “Substations” AA1 Substations Concepts and Developments” The advisory area covers the whole substation in a system approach as nodes of optimal power systems. The main directions outlined in the Strategic Plan should guide the activities related to AA1. The technical, environmental and economical aspects related to substation concepts, should be an integral part of the activities. • WG B3.11: Combining Innovation with Standardization. • B3.12 Obtaining Value from Substation Condition Monitoring • WG B3.13 Reducing Replacement Time of High Voltage Equipment. • WG B3-C1-C2.14 Circuit Configuration Optimization
Modern substation technologyCIGRE SC B3 “Substations” GAS INSULATED SUBSTATION COVERS ALL ASPECTS OF DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE AND LIFE CYCLE MANAGEMENT OF THE PRIMARY INSTALLATIONS OF GAS INSULATED SUBSTATION. • WG B3-02 “Gas Insulated Substations” • WG B3-17 "GIS Life" • WG B3-18 "SF6” • WG B3-20 "Mixed Technologies Switchgear" • WG B3/B1-09 “Application of Long High Capacity Gas Insulated Lines”
Modern substation technologyCIGRE SC B3 “Substations” AIR INSULATED SUBSTATION THE ADVISORY AREA COVERS ALL ASPECTS OF DESIGN,CONSTRUCTION,OPERATION AND LIFE CYCLE MANAGEMENT OF THE PRIMARY INSTALLATIONS OF AIR INSULATED SUBSTATION: • TF B3-15 “Cost Reductions of AIS” • Turnkey Substation
Modern substation technologyCIGRE SC B3 “Substations” ADVISORY AREA AA4 SUBSTATION MANAGEMENT • JWG B3-06 -Substation Management- • JTF B3/A2/A3/B2/C2-19 - Dynamic Loading of Electric Power Transmission Equipment
Modern substation technologyCIGRE SC B3 “Substations” SCB3 “Substations” Information:www.cigre-b3.org/ Contact: Hanna Abdallah (US Delegate-Substation Committee) Email: Hannaessa.abdallah@aps.com Virginia C. Sulzberger (USNC Secretary-Treasurer) Email: v.c.sulzberger@comcast.net
Documentation of Work (1) • DOCUMENTATION • Publish and make available papers and guides drawn up by CIGRE, such as : SF6, EMF, Mixed Technologies Switchgear… It should contribute to recognition of CIGRE as a technical reference body.
Documentation of Work (2) • ELECTRA (CIGRE Publication) • A report on the technical activities of CIGRE, referred to as General Report, will be published every year in the June issue. To this end, the detailed Study Committee Progress Reports on the basis of which the General Report will be drawn up will have to be available by mid-April. These Progress Reports and the General Report will be available on the CIGRE website and freely accessible to all.
SC B3 “Substations” next meeting: (CIGRE conference Paris) Thursday 28th August 2008 Palais des Congrès, Salle Bleue, 08.45 hrs I hope to welcome you all!
Preferential Subject 1 • PS1: • Lessons learned on Substation Asset Use Optimization • Refurbishment, renewal and maintenance strategies. • Influences of dynamic loading on maintenance policy and asset performance. • Substation lifecycle cost reduction. • Benefits of condition monitoring for decision support.
Preferential Subject 2 • PS2: • New Challenges in Substations • Impacts of future network concept, e.g. “smart grids”, on substation design, primary and secondary (digital communication, automation, control and operation) • Connecting new renewable generation including offshore substations. • Coping with major growth, e.g. mega-cities and metropolitan areas. • Designs for least environmental impact. • Innovative designs/layouts to increase operational flexibility, overcome site constraints (including economical consequences), etc. • Impact and experience of the process bus on the substation as a whole.
See you in Paris Modern substation technologyCIGRE SC B3 “Substations”