Learn about the key components of the RES Transmission Legislation, including plans for network enhancement, collaboration with MISO, stakeholder consultations, and report submissions to PUC. Dive into analyses, conceptual plans, transmission line proposals, and action plans to meet RES milestones. Stay informed on utility percentages and Xcel milestones.
E N D
MN Transmission for Renewable Energy Standard NM SPG Update 4/3/07
Issue • In 2007, the MN Legislature passed, and the Governor signed legislation regarding “Transmission for Renewable Energy Standard”. 216B.1691
Key Components of RES Transmission Legislation • Study and develop plans for transmission network enhancement to support RES standards and milestones. • Incorporate and build upon past studies (Wind Integration). • Collaborate with MISO. • Convene and regularly consult with stakeholders (transmission planners, renewable generation technology experts) to review study methods, assumptions, results and ongoing efforts. • Submit a report to PUC on status of efforts by 11/01/07.
Report Requirements • Description of analysis undertaken and results, including critical issues that need to be addressed in order to meet RES and milestones. • Comprehensive conceptual plan (Roadmap) to going planning efforts to meet RES and milestones. • Specific transmission line proposals necessary to meet RES and milestones. • Description of how the RES transmission projects are incorporated into the Biennial Plan.
Report Requirements Cont’d • Five-year action plan that identifies specific actions that are • Necessary to implement the specific proposals • Refine and further develop transmission plans • Includes initiating CON or other regulatory proceedings
Utilities 2012 12% 2016 17% 2020 20% 2025 25% Xcel 2010 15% 2012 18% 2016 25% 2020 30% Milestones