1 / 36

Getting started: Environmental Impact Assessment (EIA)

Goal: To provide information on the EIA process and the criteria that will be needed to be evaluated for the next LC. Getting started: Environmental Impact Assessment (EIA). For the Linear Collider (LC) Project. Speaker: Caroline Waaijer 30 th August 2011 Supervisor: J. Osborne.

georgiao
Download Presentation

Getting started: Environmental Impact Assessment (EIA)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Goal: To provide information on the EIA process and the criteria that will be needed to be evaluated for the next LC. Getting started:Environmental Impact Assessment (EIA) For the Linear Collider (LC) Project Speaker: Caroline Waaijer 30th August 2011 Supervisor: J. Osborne

  2. Introduction Who am I? • Caroline Waaijer • Summer Student for John Osborne • From Amsterdam, Netherlands • Master student in Hydrology • Exchange year at EPFL, Lausanne, Switzerland • Environmental engineering courses EIA start-up manual will be available on EDMS. Caroline Waaijer

  3. Overview talk Introduction to the Linear Collider Project EIA • What is it? • Do we need to do it? • What is the EIA Process? Impact criteria • Biophysical, socio-cultural, socio-economical • Special focus on energy, water, landscaping, social acceptance (including radiation, construction issues) Conclusions Next steps Caroline Waaijer

  4. Overview talk Introduction to the Linear Collider Project EIA • What is it? • Do we need to do it? • What is the EIA Process? Impact criteria • Biophysical, socio-cultural, socio-economical • Special focus on energy, water, landscaping, social acceptance (including radiation, construction issues) Conclusions Next steps Caroline Waaijer

  5. THE LINEAR COLLIDER PROJECT [1/3] The project: • high energy and precision machine • complementing LHC Two candidates: • CLIC • ILC Parameters: Caroline Waaijer

  6. THE LINEAR COLLIDER PROJECT [2/3] Location: • on and near existing CERN land • in the Geneva Molasse basin • parallel to Jura mountain chain Geology: • Limestones, Molasse rocks, Moraines (gravel, sand, clay) Caroline Waaijer

  7. THE LINEAR COLLIDER PROJECT [3/3] Caroline Waaijer

  8. Overview talk Introduction to the Linear Collider Project EIA • What is it? • Do we need to do it? • What is the EIA Process? Impact criteria • Biophysical, socio-cultural, socio-economical • Special focus on energy, water, landscaping, social acceptance (including radiation, construction issues) Conclusions Next steps Caroline Waaijer

  9. EIA [1/2] What is it? • “A purpose of an EIA is to improve decision-making and to ensure that project options under consideration are environmentally sound and sustainable”. - World Bank, 1999 ‘People, planet, profit’(3 P’s) • Measures an organization’s success in social (people), ecological (planet) and economical (profit) values. • Guarantees a corporate social responsibility • Underlines the goal of sustainability Caroline Waaijer

  10. EIA [2/2] KeyobjectivesEIA: • Establish environmental, socio-cultural and socio-economical initial status of project area • Identify opinions and policies of actors and stakeholders • Identify potential impacts • Establish if these impacts are within permitted limits • Ensure appropriate mitigation measures are implemented • Ensure positive effects are maximized by good practice • Ensure an adequate monitoring plan is developed • Improve the environmental design of the project Caroline Waaijer

  11. EIA process How to apply an EIA? • Three main phases: • Screening • Establish necessity for EIA • Scoping • Conduct EIA • Applied to ≥ 2 alternatives • Review • Check before submission • Required Knowledge: • Multi-disciplinary • Juridical • Political / decision- making • Previous EIA studies • Engineering • Different environmental • disciplines Caroline Waaijer

  12. EIA process: Screening Does the LC project require an EIA? YES • French law: • Environmental Code: Article R 122-8I • Decree nr: 77-1141, October 12th 1977 • Swiss federal law: • Ordonnance relative à l’étude de l’impact sur l’environnement (OEIE) • EU: • Directive 85/337/EEC • Updated in 1997 (directive 97/11/EC), 2003 (directive 2003/35/EC), 2009 (directive 2009/31/EC) EIA  Feasibility Caroline Waaijer

  13. EIA process: Scoping [1/6] 1. Reconnaissance / preliminary studies What information is required? • Legal framework • French and Swiss laws and regulations • Previous experiences (LEP, LHC, CEVA, CERN tram) • Policies and decision-making • Local / regional • Stakeholders and decision-making process • Actors Caroline Waaijer

  14. EIA process: Scoping [2/6] What information is required? • Project aspects • Scope, alternatives, needs, functioning, value • Engineering aspects • Implementation phases 1. Preparation 2. Construction 3. Operation & Maintenance 4. Decommissioning • Site constructions and activities • Environmental criteria Caroline Waaijer

  15. EIA process: Scoping [3/6] What information is required? • Planning • In EIA report • Implementation phases of constructions • Environmental Management Plan (EMP) for each phase • For EIA’s next phases • Land acquirement • External consultants • Costing • Public debate  review Caroline Waaijer

  16. EIA process: Scoping [4/6] Public participation • Required by law • Start early Methods: • One-way • Provide information • flyers, information sessions etc • Two-way • Discussion sessions with locals Caroline Waaijer

  17. EIA process: Scoping [5/6] Caroline Waaijer

  18. EIA process: Scoping [6/6] 2. Assessment & Plan development • Assessment of: • Status quo (zero-point) • Effects of project • Planning of • Mitigation negative effects • Maximization positive effects • Monitoring • Reviewing Environmental Management Plan (EMP) Caroline Waaijer

  19. EIA process: Review Final report • Content • Non technical summary • Background and framework project • Necessity EIA • Status quo • Measurements • Measures • Conclusions • Annexes • Evaluation • Approval • Rejection Caroline Waaijer

  20. EIA process: Summary Caroline Waaijer

  21. Overview talk Introduction to the Linear Collider Project EIA • What is it? • Do we need to do it? • What is the EIA Process? Impact criteria • Biophysical, socio-cultural, socio-economical • Special focus on energy, water, landscaping, social acceptance (including radiation, construction issues) Conclusions Next steps Caroline Waaijer

  22. Impact criteria [1/10] Environmental criteria Remember the 3P’s? • Biophysical • Socio-cultural • Socio-economical Caroline Waaijer

  23. Impact criteria [2/10] Classification C Caroline Waaijer

  24. Impact criteria [3/10] Impact types: Caroline Waaijer

  25. Impact criteria [4/10] Impact matrix: • Visualize expected environmental impacts in every implementation phase • Example on next slide Caroline Waaijer

  26. Impact criteria [5/10] Impact matrix: • Visualize expected environmental impacts in every implementation phase • Example: Caroline Waaijer

  27. Impact criteria [6/10] Major issues for LC project: • Civil construction • Energy • Water • Social acceptance • Waste • Radiation Feasibility threat Caroline Waaijer

  28. Impact criteria [7/10] Civil construction issues: • Excavation  spoil dumps • Transportation infrastructure • Release of pollutants • ammonia leakage (LEP) • cement, sand, clay discharge to river (LEP) • Existing geothermal drillings • Visual impact • Surface buildings • Power plant • Power cables • Etc.. Caroline Waaijer

  29. Impact criteria [8/10] Energy consumption • 500 GeV: 230-245 MW • Currently: • LHC: 120 MW (180 MW at peak) • CERN: 230 MW • Canton of Geneva: 1.3 GW • Swiss power plants: • Beznau 1: 365 MW • Mühlenberg: 355 MW • Amount of Energy CLIC will need ≈ small power plant • Focus on renewable and sustainable energy development • Should be studied by experts • Only possible when layout project is known in more details Caroline Waaijer

  30. Impact criteria [9/10] Water consumption • Estimates for make-up cooling water: • 500 GeV: 550 m3/h  2.64 million m3/year • 3 TeV: 1400 m3/h  6.72 million m3/year • Water consumption CERN today: 6 million m3/year • To be taken from Lake Geneva, discharged into Rhone river (still unclear) • ~ 40 % evaporates from cooling towers • ~ 60% rejected • Focus on renewable and sustainable water use • Heat recovery • Only possible when layout project is determined • Should be studied by experts Rough estimate Caroline Waaijer

  31. Impact criteria [10/10] Social acceptance • Major feasibility issue • Problem areas: • Visual impact of constructions • Impacts during construction (vibration, traffic, noise, pollutants) • Impacts after construction (energy consumption, radiation, Pollutants, noise, traffic etc.) • Legal battles  avoid as much as possible by public participation. Caroline Waaijer

  32. Overview talk Introduction to the Linear Collider Project EIA • What is it? • Do we need to do it? • What is the EIA Process? Impact criteria • Biophysical, socio-cultural, socio-economical • Special focus on energy, water, landscaping, social acceptance (including radiation, construction issues) Conclusions Next steps Caroline Waaijer

  33. Conclusions EIA Process • Necessary to perform  feasibility issue • Complicated: multi-disciplinary and iterative • Communication is important (stakeholders and actors) • Inform public & public participation • Study EIA examples (LEP, LHC, CEVA etc) • Should start soon • Cooperation between different GS groups necessary (SE, EN, CV, etc) Impact criteria • Civil engineering important part in it • Focus on renewable and sustainable development water & energy consumption • Detailed project development necessary • Internal and external experts needed Caroline Waaijer

  34. Next steps Completion of start-up manual • Continued collaboration between CLIC-ILC • Applicable to other new projects (LHeC, Beta-beams etc) Planning • Task division • Cost estimates for EIA • Land acquirement Start • Working with French and Swiss authorities on EIA • Informing & stimulating public debate • Feasibility issue: EIA must be taken seriously EIA report • Start in-depth studies • Identification knowledge gaps • Address major issues, especially civil construction, energy, water, social acceptance Caroline Waaijer

  35. Acknowledgements • John Osborne (GS-SE) • Sonja Kleiner (GS-SEE) • Maria Rita Galan Espinosa (GS-SEE) • Bernard Jeanneret (BE-ABP) • Mauro Nonis (EN-CV) • Katy Foraz (EN-MPF) • Erik van der Kraaij (PH-LCD) • Jochem Snuverink (BE-ABP) • Gabriel Ybeles Smith (PH-UAT) Caroline Waaijer

  36. References CLIC Preparation Team CERN (2011), CLIC conceptual design report, Geneva (in progress). Galan-Espinosa, M.R.,(2009), Evaluation of risk. Renewal propositions of building 102, CERN, Geneva. Hertig J.A., (2006), Études d’impact sur l’environnement, EPFL, Lausanne. ILC GDE (2011), International Linear Collider. A technical progress report. Michel, P., (2001), L’etude d’impact sur l’environnement, Ministere d’amenagement du territoire et de l’environnement, Paris. URL: http://www.rdbrmc-travaux.com/spge/site_v2/IMG/guide-etude-impact-2.pdf OFEV (2009), Manuel EIE. Directive de la Confédération sur l’étude de l’impact sur l’environnement, Bern. URL: http://www.bafu.admin.ch/publikationen/publikation/01067/index.html?lang=fr Caroline Waaijer

More Related