CENIC/NLR Optical Network Management. Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org. Agenda. Provide overview of CENIC and NLR Optical Infrastructures Define the tools and procedures CENIC uses to monitor these networks
E N D
CENIC/NLR Optical Network Management Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC ccosta@cenic.org
Agenda • Provide overview of CENIC and NLR Optical Infrastructures • Define the tools and procedures CENIC uses to monitor these networks • Identify some challenges supporting these large optical networks
CENICCorporation for Educational Network Initiatives in California • Advanced optical network infrastructure servicing California’s colleges, research institutions and K-12 schools • Multi-tiered services across a common backbone • Cisco 15808/15454 Hybrid Long Haul platforms supporting up to 80 channels • Cisco 15540/15454 Metro platforms supporting up to 32 channels
Level3 fiber WilTel fiber Qwest fiber Other fiber Managed waves Cisco 15808 terminal Cisco 15808 OADM Cisco 15454 terminal Cisco 15454 OADM 8 8 4 4 National Lambda Rail SEA 8 8 POR 8 BOI SYR 8 8 4 4 STA 4 4 NYC 4 4 4 OGD PIT 8 8 8 DEN 8 8 CLE KAN 8 CHI 8 SVL 8 4 SLC 8 8 8 4 4 8 8 WDC 4 8 8 4 RAL RAT 4 8 4 LAX 8 4 8 8 TUL PHO 4 4 ALB 8 8 8 4 ATL 4 8 SAN 4 DAL 4 ELP 4 4 PEN 4 4 JAC 8 4 4 4 4 4 4 4 4 BAT 4 SAA 4 HOU Note: California (SAN-LAX-SVL) routes shown are part of CalREN; NLR is adding waves to CalREN systems.
Management Platforms • Craft Interfaces for individual Network Element provisioning and troubleshooting • CTC - Cisco Transport Controller • 15454 provisioning/troubleshooting • CWD - Cisco Wavelength Director • 15808 provisioning/troubleshooting • CTM - Cisco Transport Manager • GUI based NMS provides overview of multiple spans in the network. • Inventory Management • Fault Management • Performance Management • Configuration Management
Test Equipment OSA - Optical Spectrum Analyzer
Performance Monitoring • PM Reports • trend analysis • Continuous, 15 min, 1 hr reports • Forward Error Correction - FEC • Validates client’s payload over the DWDM transport
Commissioning Data Reports • Run prior to and after maintenances or service interruptions • Provides detailed analysis of optical parameters
Optical Networking Challenges • NE monitoring during fiber cuts • Complex routed solutions • Hybrid Management systems • Utilize CTM and CTC/CWD to provision and troubleshoot • NMS Upgrades to support new hardware • Documentation • Keeping provisioning data up to date • Deploying test equipment • Configuration History • Audit Trail • Alarm correlation