1 / 6

Masco Cabinetry

Masco Cabinetry. 2012 Annual Operating Plan November 18, 2011. 2012 Countertops Growth. Countertop Business Model Expansion. 2012 1 st Half. 2012 2 nd Half. 2013 1 st Half. 2011. Wave 1. Wave 2. Relocate vanity tops to Middlefield, Increase Lakewood capacity to

gerd
Download Presentation

Masco Cabinetry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Masco Cabinetry 2012 Annual Operating Plan November 18, 2011 Final - Confidential

  2. 2012 Countertops Growth Final - Confidential

  3. Countertop Business Model Expansion 2012 1st Half 2012 2nd Half 2013 1stHalf 2011 Wave 1 Wave 2 Relocate vanity tops to Middlefield, Increase Lakewood capacity to 3,150 per day Wave 3 Install fabrication capacity at the Ocala plant • $1.3M in capital • 16% efficiency and throughput improvement in Lakewood • Streamlines top and bottom vanity logistics • Lakewood plan targets 3,150 square feet per day max capacity • $850K in equipment support for NE TID spoke network • 122 Lowe’s stores in 2011, 246 out of Lakewood in 2012 As required, add capacity in Lakewood Wave 4 • $2.5M Ocala equipment capacity • $650K TID spoke equipment • 2,500 square feet per day • 86 Lowe’s store • Replace contract fabricators in ProCision model with make –vs.-buy opportunity • Co-locate with branch Build Raleigh fabrication plant • $1.8M in Lakewood equipment capacity • Grow Lakewood to 4,350 max sqft/day capacity • Upside for Home Depot, Builder/Dealer programs NE • $3.0M Raleigh equipment capacity • $850K TID spoke equipment • 2,500 square feet per day • Co-locate with branch Growth Competitive Advantage Game Changing Final - Confidential

  4. 2012 – Display and Capital Expenditures (dollars in thousands) * 2011 based on 9+3 (September) Forecast • $2.5M Establish countertop fabrication capability in Ocala • Support Lowe’s Kitchen program expansion in Florida $18.7M annualized • $1.0M Implement Oracle across the countertop facilities • Systems and controls integration • $2.5M Increase Lakewood fabrication capacity • Support Lowe’s Kitchen program expansion in NE $24.0M annualized Final - Confidential

  5. 2012 AOP Growth Initiative Expenditures (dollars in thousands) * * 2011 based on the 8+4 (August) Forecast as required Final - Confidential

  6. 2012 – Display and Capital Expenditures (dollars in thousands) * 2011 based on the 8+4 (August) Forecast as required • $2.5M Establish countertop fabrication capability in Ocala • Support Lowe’s Kitchen program expansion in Florida $18.7M annualized • $1.0M Implement Oracle across the countertop facilities • Systems and controls integration • $2.5M Increase Lakewood fabrication capacity • Support Lowe’s Kitchen program expansion in NE $24.0M annualized Final - Confidential

More Related