1 / 14

TASK 2 Progress Meeting 1

TASK 2 Progress Meeting 1. Richard Siddans, Brian Kerridge, Jane Hurley STFC Rutherford Appleton Laboratory, UK. Outline. WBS Overview of tasks accomplished/remaining Technical details of WP Summary. WBS. Task overview status. Update spectroscopic database …. Current FM: RTTOV

gerik
Download Presentation

TASK 2 Progress Meeting 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TASK 2Progress Meeting 1 Richard Siddans, Brian Kerridge, Jane Hurley STFC Rutherford Appleton Laboratory, UK

  2. Outline • WBS • Overview of tasks accomplished/remaining • Technical details of WP • Summary

  3. WBS

  4. Task overview status

  5. Update spectroscopic database … • Current FM: • RTTOV • using RFM-derived • coefficients • HITRAN 2008 • Updated FM: • RTTOV • using LBLRTM-derived • coefficients • HITRAN 2012 • LBLRTM v12.2 instead of RFM, using AER v3.2 line parameter database rtweb.aer.com/lblrtm_frame.hmtl • CH4 and CO2 line-mixing, and fixed HDO/H2O ratio

  6. ‘Nominal’ difference LBLRTM/RFM

  7. ‘Coupling’ difference

  8. ‘Spectral’ difference

  9. ‘FM’ difference N2O F14 H2O CO2 CH4

  10. ‘HITRAN’ difference H2O CH4

  11. Implement spectroscopic database … Impact of spectral differences δTB(ν) attributable to • the running of full nominal versions of LBLRTM and RFM (line-mixing ‘on’ + AER v3.2 vs. line-mixing ‘off’ + HITRAN 2008) • line-mixing ('on’ vs. ‘off’) • basic spectral data (AER v3.2 vs. HITRAN 2008/2012) • the forward model itself (LBLRTM vs. RFM) • the update from HITRAN 2008 to 2012 (RFM vs. RFM)

  12. Summary • Assessed differences between LBLRTM and RFM, with intention of updating current FM with LBLRTM to include line-coupling • Differences attributable to FM, basic spectral data, line-mixing, HITRAN • Species affected = H2O and CH4, mostly • Assessed impact on retrievals by updating the FM to LBLRTM to include line-coupling • Difference in spectroscopy typically changes retrieved CH4 concentration by less than 0.5% • Since impact on retrieval is so much smaller than known issues with retrieval (4% increase in CH4 and residual fitting across-track), there will be no improvement in implementing line-mixing in updated FM

More Related