An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. b* leveling and Collide and Squeeze MDs BE-OP-LHC Gorzawski andJ. Wenninger and many others LHC Studies Working Group Day, 2.09.2014

  2. Outline • b* leveling/ Collide and Squeeze, MDs in Run1: • MD on June 2012 + floating MD on July • MD on October 2012 • MD scenariosfor Run2: • 6.5 TeV • 450 GeV LHC Studies Working Group Day

  3. Outline • b* leveling/ Collide and Squeeze, MDs in Run1: • MD on June 2012 + floating MD on July • MD on October 2012 • MD scenariosfor Run2: • 6.5 TeV • 450 GeV LHC Studies Working Group Day

  4. Past MDs devoted to b* leveling • 2012 June (+July) • CERN-ATS-Note-2012-071 MD • Fills: 2748 + 2828 and 2829(20 days later, floating MD) • No of bunches: 3 and 48 (2829) • 2012 October • CERN-ATS-Note-2013-002 MD • Fill: 3143 • No of bunches: 3 nominal + probe LHC Studies Working Group Day

  5. MD in June (2012-071 MD) • Separate Hyper Cycle 4TeV 10Aps 0.6m BSTAR LEVEL • RAMP 4TeV 2012 V1 BLEVEL • SQUEEZE 4TeV LONG 2012 V1 BLEVEL • Settings were cloned and modified to provide collisions for b* values between 3m and 0.6m • TCTsat 3m were set to Stable Beams, 0.6m, settings. At 3 m, the luminosity scan and orbit corrections were incorporated forward into the squeeze functions as constant increments to the existing settings, later procedure was repeated at each MP LHC Studies Working Group Day

  6. MD in June (2012-071 MD) LHC Studies Working Group Day

  7. MD in October (2013-002 MD) • Same settings as during previous MD, • Only one dedicated fill: 3143 • Three bunches + probe • Exercised region 9m – 3m • From 9m to skip the step with tune change. • Goal was to ‘reconnect’ settings the with previous MD (at 3m) and check validity with a larger time interval. 2nd MD 2nd MD 1st MD LHC Studies Working Group Day

  8. MD in October (2013-002 MD) Luminosity evolution during the MD (2.5h) • The Luminosity dips (upper figure) are due to feed forwarded orbit corrections • Not negligible orbit deviations (up to 1.5s) due to long break between MDs LHC Studies Working Group Day

  9. Outline • b* leveling/ Collide and Squeeze, MDs in Run1: • MD on June 2012 + floating MD on July • MD on October 2012 • MD scenariosfor Run2: • 6.5 TeV • 450 GeV LHC Studies Working Group Day

  10. MD scenarios • In IR8 as an additional squeeze steps at 6.5 TeV • In any IR at 6.5 TeV • In IR1/5 at 450 GeV • In IR8 as a final part of the operational cycle LHC Studies Working Group Day

  11. (1) At IR8 as an End of Fill test/ MD • Use an additional segment from 3m to 2m that can be run as an extra at the end of the fill • Aperture to be checked • It is easy to set up - only 4 optic steps. Operational part for IR8 LHC Studies Working Group Day

  12. (1) At IR8 as an End of Fill test/ MD • Only standard optics correction needed, IR1/5 balance is not critical (MD). • Loss maps and asynchronous dump tests could be made in one fill. • Can only be used at the end of the very long fills (offset leveling @3m exhausted) or as EoF tests provided the luminosity is allowed to exceed the usual target. LHC Studies Working Group Day

  13. (2) At any IR (1/5) at 6.5 TeV • Requires settings cloning procedure as before • 2012 MD procedure • b* range to be defined • Full or subset of 11m – 0.65m (down to 0.4m) • Setup could directly be used for operational collide/squeeze and b* leveling • Significant setup and validation time may be required LHC Studies Working Group Day

  14. (3) At IR1/5 at 450 GeV • Requires a flat machine • to transfer aperture gain to b* reach (see fig.) • Provides the range from 11m down to ~5m • With 1m/0.5msteps • Required PC currents seem OK (>I_min) for Q4, Q5 and Q6 • Likely that no optics correction is required (should measure optics) as long as beta beat does not degrade • Much easier and faster commissioning than at 6.5 TeV • Loss maps + asynchronous dump validation in 2-4h? 12.5s In blue extra aperture gained after removing the Xing bumps LHC Studies Working Group Day

  15. (3) At IR1/5 at 450 GeV • Performed with 1-10 nominal(?) bunches • Could remain < SBF threshold • Gives the possibility of few full procedure cycles – due to the saved time on the ramp! • In a 8h slot up to 3-4 repetitions • Beam - beam (?) • An Operation at the thetop energy will only profit from experience gained at the injection level • not from the settings and corrections • The final feasibility study is still on going. LHC Studies Working Group Day

  16. Conclusions • Two 2012 MDs proved the possibility of using the b* leveling • The possibility of performing MDs at 450GeV may enable to test entire mechanics and gain significant experience. • Only mixture of the Injection level and Top energy level MD gives the full picture of the process. • In the view of requirements for later part of Run 2 it essential to gain an experience with the process. LHC Studies Working Group Day

  17. The end

  18. At IR8 as an end of the fill test/ MD • Is a part ~5m down to 3m of the squeeze • Only fills that >7h enough can be used • Requires only 8 (instead of 20) points to commission with all corrections • Will shorten the the commissioning prognostics • Needs few fills to build the loss map and perform asynchronous beam dump. • It is not a real MD but part of the operational cycle That is postponed later in the fill. A.Gorzawski at 5th Evian Workshop R.Tomas at LS1 LBOC meeting No 23 LHC Studies Working Group Day