An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EIA-CEQR

  2. KEY TERMS IN EIA • Significant impact – A key term in EIA process -which requires and EIS SIGNIFICANT IMPACT INTENSITY CONTEXT -refers to the severity of the impact -It must be analysed relative to society as whole

  3. POINTS TO BE CONSIDERED -INTENSITY • The occurrence of impacts that may be both beneficial and adverse • Degree of impact – public health and safety • Unique characteristics of the geographic area • The degree to which the effects on the quality of human environment are likely to be highly controversial • The degree to which the possible effects on the human environment are highly uncertain • Whether the action is related to other action which individually insignificant but cumulatively significant • The degree to which the action may adversely affect districts, sites, highways, structures or • The degree to which the action affect endangered or threatened species • Whether the action risks a violation of law.

  4. Environmental Impact Statement • It is a written document and act as action forcing device • It should ensure that the policies and goals defined in the NEPA are infused into the ongoing programs • It should focus on discussing significant impacts • It serve as a decision making agent for federal governments

  5. TYPES OF EIS • Draft EIS • Prepared by lead agency – circulated for review • Final EIS • Modified draft EIS – include all valid suggestion by reviewer • Supplemental EIS • If any substantial changes in the proposed action – that should be supported with supplemental EIS The approach used to prepare these EIS should be interdisciplinary systematic and reproducible

  6. PUBLIC PARTICIPATION • It is achieved in the EIA process by means of • Early scoping • A public participation program during the EIA study • The review process for draft EIS

  7. SCREENING IN THE EIA PROCESS Policy Plan Program Project Permit Scoping (What issues/impact need to be addressed in EIS? Screening (Is EIS needed?) Preliminary study Plan and conduct comprehensive impact study

  8. SCREENING IN THE EIA PROCESS • Two fundamental approach for determining whether or not conduct comprehensive EIA • Policy delineations- e.g policy delineation by WB • Project require EIA • Limited environmental review • Do not need environmental analysis • Beneficial projects and emergency recovery projects • Conduction of preliminary study

  9. PLANNING AND MANAGEMENT OF IMPACT STUDIES INITIAL PDN PII IPI DAE IMPACTS IP IA (PP) IM DECISION MAKING SPA (PP) DOCUMENTATION PWD EM