1 / 5

OpenADR Phase 2

OpenADR Phase 2. Document Plan. PEV Next Steps. Initial scope Limit to fixed charging (?) ID multiple use cases Already generated EPRI Repository PAP11/SAE? SCE (Carl will donate) V2G DWEG (Ed) IKB Use case page in SGIP Sub group / analyze and extract (Mike & Chris K.)

gil
Download Presentation

OpenADR Phase 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OpenADR Phase 2 Document Plan

  2. PEV Next Steps • Initial scope • Limit to fixed charging (?) • ID multiple use cases • Already generated • EPRI Repository • PAP11/SAE? • SCE (Carl will donate) • V2G DWEG (Ed) • IKB Use case page in SGIP • Sub group / analyze and extract (Mike & Chris K.) • Categorize by relevance to DR • Look for additional requirements (data and service)

  3. FastDR Next Steps • Define Scope • Ancillary Services • IRC categorization (Ed) • ID the resource and response requirements; not in use case form • IRC participation/input • CALISO/NYISO telemetry requirements • CALISO roadmap (high level systems) (Ed /H. Sanders) • NYISO (Ed – Donna) • Define points of interoperability appropriately • Aggregator is primary player • Pilot projects • Published and unpublished (Albert – PG&E, Carl – SCE, SDG&E?) • Sub group / analyze and list DR use cases • Categorize by relevance to DR • Look for additional requirements (data and service)

  4. DG (DER) next steps • Distributed Generation (DER) • Define scope of OpenADR & Role of DER • Customer owned Distributed generation • Limited to entities that have load characteristics (&baseline) • Fixed location (? – need to consider in context of PEV) • Demand Response • net objective; • Compatible with existing DG model(s) • DER data model (John) • Identify relevant use cases (i.e. w/i scope) • ID key actors • Small set of topologies • Sub group / analyze and list DR use cases • Categorize by relevance to DR • Look for additional requirements (data and service)

  5. Security Next Steps • Security • Sub group with UTILSec • Create listserv for subgroup • Analyze existing 3PDA Use Cases • Define scope/boundaries of 3rd party interaction • Harmonize actors • Compare to Existing OpenADR Use Cases • Replace 3rd party info. Interactions with DR C&C • Consider level of party trust assumptions (each party) • Liaison & Revised 3PDA with SGIP CSWG

More Related