50 likes | 145 Views
OpenADR Phase 2. Document Plan. PEV Next Steps. Initial scope Limit to fixed charging (?) ID multiple use cases Already generated EPRI Repository PAP11/SAE? SCE (Carl will donate) V2G DWEG (Ed) IKB Use case page in SGIP Sub group / analyze and extract (Mike & Chris K.)
E N D
OpenADR Phase 2 Document Plan
PEV Next Steps • Initial scope • Limit to fixed charging (?) • ID multiple use cases • Already generated • EPRI Repository • PAP11/SAE? • SCE (Carl will donate) • V2G DWEG (Ed) • IKB Use case page in SGIP • Sub group / analyze and extract (Mike & Chris K.) • Categorize by relevance to DR • Look for additional requirements (data and service)
FastDR Next Steps • Define Scope • Ancillary Services • IRC categorization (Ed) • ID the resource and response requirements; not in use case form • IRC participation/input • CALISO/NYISO telemetry requirements • CALISO roadmap (high level systems) (Ed /H. Sanders) • NYISO (Ed – Donna) • Define points of interoperability appropriately • Aggregator is primary player • Pilot projects • Published and unpublished (Albert – PG&E, Carl – SCE, SDG&E?) • Sub group / analyze and list DR use cases • Categorize by relevance to DR • Look for additional requirements (data and service)
DG (DER) next steps • Distributed Generation (DER) • Define scope of OpenADR & Role of DER • Customer owned Distributed generation • Limited to entities that have load characteristics (&baseline) • Fixed location (? – need to consider in context of PEV) • Demand Response • net objective; • Compatible with existing DG model(s) • DER data model (John) • Identify relevant use cases (i.e. w/i scope) • ID key actors • Small set of topologies • Sub group / analyze and list DR use cases • Categorize by relevance to DR • Look for additional requirements (data and service)
Security Next Steps • Security • Sub group with UTILSec • Create listserv for subgroup • Analyze existing 3PDA Use Cases • Define scope/boundaries of 3rd party interaction • Harmonize actors • Compare to Existing OpenADR Use Cases • Replace 3rd party info. Interactions with DR C&C • Consider level of party trust assumptions (each party) • Liaison & Revised 3PDA with SGIP CSWG