Afternoon Workshop SectionsBest Practices, Inform Design, M&V • Modeling Processes • Best Practices • Integrated Design Process • Modeling Procedures • Pre-Design • Schematic Design • Design Development • Construction Documents • Post Occupancy 1
BEST PRACTICES IBPSA - USA Building Simulation Modeling 2
Overview • Consistency in methods • Reduction in input errors • Generation of reasonable performance values Modeling best practices are methods incorporated into everyday practice that support: 3
Destination The art in energy modeling is to create a model that is as simple as possible while still providing reasonably accurate results. This requires good judgment and experience. 4
Setting ExpectationsBlack Belt Energy Modeling Concept created and developed by Ellen Franconi, Rocky Mountain Institute, See http://www.ibpsa.us/workshop/ for expanded table 5
Real World Challenges Challenges Strategies From Michael Donn. “Quality Assurance – Simulation and the Real World” , 1999 IBPSA Proceedings . See www.ibpsa.org/proceedings/BS1999/BS99_P-05.pdf 6
General Principles • Be knowledgeable of the inner workings of the simulation tool • Be knowledgeable of the technologies being modeled • Prioritize efforts • Follow modeling procedures that facilitate quality assurance 7
General PrinciplesKnowledge of Inner Workings – Load Calcs DOE2 Envel-ope Solar Lights People/ Equip RF WF WF WF WF S Space Load Benefits Proven accurate for most cases. Fast calculations. Benefits Calculates surface temperatures, allowing comfort calculations and control. Radiant heating/cooling model. 8 EnergyPlus • Envelope gain • Transfer function • Space loads • Surface/air heat balance • Iterative calc
General PrinciplesKnowledge of Inner Workings DOE2.2 • Sequential Calculations • Full year loads, then systems • Load calc at constant temperature Loads Loads Each timestep Systems Systems Benefits Proven accurate for most cases. Fast calculations. Benefits Output reports show breakdown of loads by source. 9 EnergyPlus Simultaneous Calculations Temperature can vary each hour per t-stat setpoint
General PrinciplesKnowledge of Inner Workings • Perform test runs • Check standard reports • Create and compare hourly output data • Review documentation 10
General PrinciplesKnowledge of Technologies • Colleagues • Manufacturers / Distributors • Technical Journals and Conference Proceedings • DOE Building Technologies Program website http://www1.eere.energy.gov/buildings/technologies.html • http://www1.eere.energy.gov/buildings/information_resources.html • Energy Design Resources website • Design Guidelines: HVAC Simulation Guidelines • Design Guidelines: Advanced Variable Air Volume (VAV) Systems • Design Guidelines: CoolTools Chilled Water Plant • List Serve:buildingone.org 11
General PrinciplesPrioritizing Efforts Climate analysis and climate-based design strategies See EERE tool directory - http://apps1.eere.energy.gov/buildings/tools_directory/ http://www.aud.ucla.edu/energy-design-tools 13
General PrinciplesPrioritizing Efforts Resources for Gaining Insights 15
General PrinciplesPrioritizing Efforts Resources for Gaining Insights 16
General PrinciplesFacilitateQuality Assurance Checking model input • Document assumptions and input values • Use pre-processing tools/spreadsheets to convert component descriptions into modeling input values • Import input file segments for complex components modeled often in projects • Make design changes incrementally in the model RMI Tool 17
General PrinciplesFacilitateQuality Assurance Example Input File Snippets for DOE-2.2 $ EXTERIOR WALL "R-eff wall" = MATERIAL TYPE = RESISTANCE RESISTANCE = 7.2 $ASHRAE 4A - 7.2 eff R-value R-13 batt in 4", 24"o.c. steel frame $ Specify with parameter value - {#pa("R Stud Wall")} .. "R-ci wall" = MATERIAL TYPE = RESISTANCE RESISTANCE = 7.5 $ASHRAE 4A - 7.5 continuous insulation outside stud wall $ Specify with parameter value - {#pa("R CI Wall")} .. "ASHRAE EWall Cons Layers" = LAYERS MATERIAL = ( "GypBd 1/2in (GP01)", "Bldg Paper Felt (BP01)", "R-ci wall", "R-eff wall", "GypBd 1/2in (GP01)" ) THICKNESS = ( 0.042 ) .. "E1 EWall Construction" = CONSTRUCTION TYPE = LAYERS ABSORPTANCE = 0.6 ROUGHNESS = 1 LAYERS = "ASHRAE EWall Cons Layers" $ substitute value with parameter name - e.g. ext_wall_layers[] $ {SymIndex(#pa("Exterior Wall Layers"),"CONSTRUCTION","LAYERS")} http://www.rmi.org/rmi/ModelingTools 18
General PrinciplesFacilitate Quality Assurance Checking model output • Develop a review check list • Extract data for evaluating reasonableness of results • Key output values • Metrics, back-of-the-envelope calculations, hourly data • Extract results from output files and report side-by-side • Evaluate against rules-of-thumb metrics • Evaluate against performance of actual buildings • Evaluate against each run – is the change as expected? RMI Tool 19
General PrinciplesFacilitateQuality Assurance – Partial Check list 20
General PrinciplesFacilitateQuality Assurance – Key Metrics* *Typical of office buildings: low–very energy efficient, medium -code, high–existing buildings 21
General PrinciplesFacilitate Quality Assurance Reconciliation • Look for careless errors in input • Examine simulation output for explanation • Make sure you understand simulation algorithms • Make sure the model captures actual process/systems • Increase model detail if needed • Tweak uncertain inputs within a reasonable range of values • Peer review RMI Tool 22
Modeling Best Practices Presenting Results Documenting Assumptions, Energy Efficiency Measures, Packages 23
Modeling Best Practices Presenting Results Documenting Assumptions, Energy Efficiency Measures, Packages 24