1 / 19

Capital Campaign Kickoff

Capital Campaign Kickoff. Over 400 parishioners met our architects and got a preview of some of the architectural drawings for our new church. Capital Campaign Kickoff. Building Committee Chair, Bill Knauer , and Capital Campaign Director, Stephen Carr. Capital Campaign Kickoff.

ginger
Download Presentation

Capital Campaign Kickoff

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capital Campaign Kickoff • Over 400 parishioners met our architects and got a preview of some of the architectural drawings for our new church.

  2. Capital Campaign Kickoff Building Committee Chair, Bill Knauer, and Capital Campaign Director, Stephen Carr

  3. Capital Campaign Kickoff Parishioners socialize and get a first look at architectural drawings.

  4. Capital Campaign Kickoff Father Mosimann talks with some parishioners about some design considerations for our new church.

  5. Capital Campaign Kickoff Architect Art Lohsen points out some design details and responds to parishioner questions.

  6. Vision for Our New Church • Respect the central mystery of our faith - the Eucharist • Show unity of the Crucifix, Altar and Tabernacle as the elements representing this mystery • Enable all to worship through appropriate space design and use of religious elements • Articulate our history in Leesburg • Incorporating elements of our Little Church • Provide a welcoming façade to our town

  7. A preliminary design for our new church. Capital Campaign Kickoff

  8. Capital Campaign Kickoff Some preliminary designs for the interior of our new church.

  9. Some exterior options for our new church. Capital Campaign Kickoff

  10. Capital Campaign Kickoff A design for our campus

  11. When can we break ground? When we have 50% of the estimated church construction costs in our building fund. and We can demonstrate a plan to successfully retire the remaining 50% debt within a reasonable timeframe.

  12. Chairperson Communication Scribe Finance Bill Knauer At Large Diane Beauchamp Betty Eisenmann Barry Nelen Jim Wynn Sue Patania Hospitality Jim Patania Karen Stapleton Katie Maceda Building Committee Members Fundraising Arts & Liturgy Jack Fox Jack Hanssen Phil Rusciolelli Bio Summary Sheet is available in the literature racks in vestibule

  13. Goals of Building Committee • Raise the necessary funds to break ground on our new church • Finalize design of the new church • Provide information to parishioners • Build a church which gives glory to God, as soon as possible     • Honor the legacy of Leesburg Catholics by providing a Catholic gateway to the historic district 

  14. Spirit DayPreparation for Confirmation picture

  15. First Youth Mass Join us for an upcoming Youth Mass on the third Sunday evening of every month

  16. St. Francis of Assisi – October 4

  17. Youth Rally

  18. All Saints Day Parade

More Related