1 / 13

CORPS 101

Discover the Corps.101 programs and policies for water resources development, including disaster response, hydropower, flood control, navigation, and more. Get an overview of key laws and authorities, project phases, and budgeting process. Contact us for any questions.

girardi
Download Presentation

CORPS 101

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CORPS 101 Brandon R. Brummett, P.E., PMP Outreach Coordinator Louisville District 07 May 2010

  2. Disaster Response Hydropower Water Supply Recreation Shore Protection Flood and Storm Damage Reduction Navigation Regulatory Program Facilities Design & Construction Environmental Infrastructure Ecosystem Restoration Installation Support Watershed Planning Corps Missions

  3. CECIL M. HARDEN ROUGH RIVER CARR CREEK Civil Works Boundaries SALAMONIE J. EDWARD ROUSH Olmsted Locks and Dam MISSISSINEWA CLARENCE J. BROWN OH IN CAESAR CREEK BROOKVILLE CAGLES MILL WEST FORK MILL CREEK MONROE WILLIAM H. HARSHA IL RIVER MARKLAND L&D T PATOKA RIVER WABASH CANNELTON McALPINE L&D KY NEWBURGH L&D T € OHIO JOHN T. MYERS T CAVE RUN TAYLORSVILLE T T L&D T Louisville 1 T L&D 52 T T 2 NOLIN L&D 53 T T BUCKHORN GREEN RIVER SMITHLAND L&D OLMSTED L&D BARREN RIVER TENN

  4. It Takes Two to Tango • Authorization • Study, program, or project • Water Resources Development Act (WRDA) • Committee resolution • Appropriation • Approval to obligate and expend funds for an authorized study, program, or project • Annual Energy & Water Development Appropriation Act (EWDA)

  5. Key Policy and Laws • Flood Control & WRDA • 1936 FCA – benefits exceed costs (benefit cost ratios) • 1986 WRDA – cost sharing required for most projects • Laws, Statutes and Executive Orders • National Environmental Policy Act • Clean Water Act • National Historic Preservation Act • EO 11988 – Flood Plain Management

  6. General Investigations Project Study Authority Recon Phase • Letter of Intent • Recon Report - 905 (b) Feasibility Phase • Feasibility Cost Sharing Agreement • Chief’s Report Preconstruction Engineering and Design Project Authorization Project Construction

  7. Continuing Authorities Project Feasibility Phase • Preliminary Assessment Report • Feasibility Cost Sharing Agreement • Detailed Project Report Plans & Specifications Phase • Project Cooperation Agreement Execution • Real Estate Acquisition Project Construction

  8. Continuing Authorities Program Overview Annual per Section Description Per Project Program ($M) ($M) 14 Streambank/Shore protection 1.5 15 107 Navigation 7 35 205 Flood Damage Reduction 7 55 208 Flood Snagging/Clearing 0.5 7.5 206 Aquatic Restoration 5 40 1135 Ecosystem Restoration 5 25

  9. Other Authorities • Environmental Infrastructure (Section 219) • Planning Assistance to States (Section 22) • Flood Plain Management Services Program • Emergency Management (PL 84-99) • Major Rehabilitation (O&M)

  10. HQ Provides Budget Guidance ( Mar ) HQ Review & Approval ( May -Jun ) EC11-2-xxx OMB Provides Budget Guidance ( Jan ) Field Offices Develop Program Requirements ( Mar - Apr ) Funding Alloc. To Field Offices ( Oct - Dec ) Budget Cycle Budget Presented to Sec. Army (Jul - Aug ) Budget Submitted to OMB ( Sep ) Cong. Hearings ( Mar - Apr ) OMB Passback ( Nov ) President Signs Approp. Bill ( Sep - Oct ) Appropriations Bills ( Jul - Sep ) President’s Budget to Congress ( Feb ) Budget Resolutions

  11. For Further Information COL Keith A. Landry, P.E., Ph.D. Commander and District Engineer 502.315.6102 Mr. David F. Dale, P.E., PMP Deputy District Engineer 502.315.6104 Ms. Linda R. Murphy, P.E. Chief, Civil Project Mgt. Branch 502.315.6784 Ms. Sharon M. Bond Chief, Planning Branch 502.315.6857 Mr. Brandon R. Brummett, P.E., PMP Outreach Coordinator 502.315.6883 Ms. Susan M. Toutant, P.E., PMP Executive Liaison Officer 502.315.6105

  12. https://155.80.93.240/congress/usace/

  13. Questions?

More Related