1 / 19

OP during LS1

OP during LS1. Mike Lamont. 24/7/365 as usual. ELENA CONSOLADATION. - LINAC4 - BOOSTER UPGRADE - HIE - ISOLDE - TSR. - ACCOR - PS UPGRADE - CTF3. BE-OP 2013 to 2014. Technical infrastructure coverage 2 nd operator required at all times Work on non-LHC projects

gittel
Download Presentation

OP during LS1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OP during LS1 Mike Lamont

  2. OP@LS1

  3. 24/7/365 as usual ELENA CONSOLADATION - LINAC4 - BOOSTERUPGRADE- HIE-ISOLDE- TSR - ACCOR - PS UPGRADE - CTF3 OP@LS1

  4. OP@LS1

  5. OP@LS1

  6. BE-OP 2013 to 2014 • Technical infrastructure coverage • 2nd operator required at all times • Work on non-LHC projects • LINAC4, PSB upgrade, SPS upgrade, HIE-ISOLDE • Work on non-LHC consolidation • AD, PSB, PS, SPS • Shutdown coordination • Controls renovation • CTF3 operations OP@LS1

  7. AD Largely dominated by AD consolidation and ELENA OP@LS1

  8. LHC • Heavy involvement in consolidation • Have also to look forward to hardware commissioning OP@LS1

  9. PS OP@LS1

  10. PSB HIE-ISOLDE, Booster upgrade, LINAC4 commissioning, software OP@LS1

  11. SPS OP@LS1

  12. OP@LS1

  13. LHC consolidation OP@LS1

  14. Requests LHC consolidation Fully covered OP@LS1

  15. Requests R2E and support for Engineering for coordination OP@LS1

  16. Requests QPS, LHC & SPS vacuum, LINAC4, Cabling, RF software, BI, CTF OP@LS1

  17. RF software • Denis Cotte would be a good candidate to help with software for RF in the PS complex in LS1 - noted • YannickLe Borgne to work with Anthony on the SPS RF controls renovation as we already discussed. • Have discussed with  Joao Carlos Oliveira he confirms that he is interested in working with us, during the LS1, on PLC projects. • It was already agreed, with K. Hanke, that Miguel Lozano  will help for HIE-Isolde controls with D. Glenat OP@LS1

  18. Cabling • At present there are two operators earmarked to work on cable supervision they are: • FabriceChapuis :  • Mainly for any PSB cabling works, since he nows that machine very well. He might also be useful for any Linac4 works.  • Pascal Fernier: • Mainly for ISOLDE (and HIE-Isolde)  • The only issue here might concern the preparation of the cabling campaigns – if this needs to be done during the running period of 2012.  Both will continue working on the operation of the machines until the beginning of LS1.  • Isabelle Laugieralso now done for 50% cabling support (tbc) OP@LS1

  19. OP@LS1

More Related