Ch.11 Project Monitoring and Control. Actual x Planned Performance x Standards Three parts Planning Comparing Correcting. Project Control. Regulate results through altering activity Conserve organization’s physical, human and financial assets. Project Monitoring.

giza
Download Presentation

Ch.11 Project Monitoring and Control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ch.11 Project Monitoring and Control • Actual x Planned • Performance x Standards • Three parts • Planning • Comparing • Correcting

  2. Project Control • Regulate results through altering activity • Conserve organization’s physical, human and financial assets

  3. Project Monitoring • Collecting, recording, and reporting information concerning all aspects of project performance

  4. Common problems w/reports • Too much detail/information • Separate technical from non-tech info. • Interface between the project information system and parent firm’s information system. • Planning x monitoring: monitoring system not tracking information directly related to project’s plans. • Project Reports needed immediately

  5. Meetings • Should be used for making decision or getting input for important problems. Avoid “show and tell” meetings. • Preset starting and stopping times and stick with them. • Make sure everyone does HW before meeting. • Must take notes and distribute notes of meeting not later than next day. • Avoid attributing remarks or viewpoints to individuals in the minutes. • If a serious problem arises in a meeting, call a meeting to deal with that crisis. Otherwise, stopping time will not be kept.

  6. Cost, Time and Performance must be analyzed together • What is wrong with the statement below ? We have completed 50 % of the time line and we spent 50% of the budget. We are right on track. A. Cost and Time Alone Can’t Work.

  7. Control is directed to • Performance • Cost • Time

  8. Controlling costs manager compares budgets to • actual cash flows • Purchase orders • Labor hour charges • Amount of overtime worked • Absenteeism • Accounting reports

  9. To control performance PM examines • Test results • Quality checks • Maintenance activities

  10. Controlling schedule manager examines • Benchmark reports • Status reports • PERT/CPM networks • Gantt charts • WBS

  11. Postcontrol reports • Project objectives • Milestones and budgets • Final project results • Recommendations for improvement

  12. Control System • Should not exceed 5% of cost of the whole system. • Should give immediate results in order to correct them.

  13. Control System may • Change manually when variation detected • Change automatically when variation detected • Adjust the goals when variation detected.