1 / 7

LANL Engineering Standards Program ESWOG 2002

LANL Engineering Standards Program ESWOG 2002. Tobin Oruch, Eng Standards Manager Ph. 505-665-8475, oruch@lanl.gov Facility and Waste Operations Division (FWO) Systems, Engineering and Maintenance Group. LANL in FY02. LANL 6,800 U. of CA employees + 2,800 contractors

gizi
Download Presentation

LANL Engineering Standards Program ESWOG 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LANL Engineering Standards ProgramESWOG 2002 Tobin Oruch, Eng Standards Manager Ph. 505-665-8475, oruch@lanl.gov Facility and Waste Operations Division (FWO) Systems, Engineering and Maintenance Group

  2. LANL in FY02 LANL • 6,800 U. of CA employees + 2,800 contractors • Annual budget of approx $1.2B (~$2B in ‘02) Eng Standards Program -- base budget = ~3 FTEs + IHS $ • 2 full-time engineers managing/ authoring • part-time admin/webmaster • part-time discipline Points-of-Contact • unpaid Tech Committee members

  3. LANL Standards Program Products Online • LANL Engineering Manual (LEM) • Design Criteria -- Reqt’s and Guidance • 8 chapters by discipline -- General, Fire, Civil, Arch, Struct, Mech, Elect, I&C • Include Standard Details • LANL Construction Specs Manual (LCSM) • ~150 specs in CSI MasterFormat Div 1-16 • Drafting Manual (DM) • covers facility work • machine part drafting in another group’s manual

  4. Initiatives Completed Since June 2001 -- Dallas Program • Scope expanded to add programmatic work • selected requirements noted for R&D/experiments • QA Plans and procedures added • to meet 10CFR830 Subpart A • Intro to Stds Training Course developed, teaching Eng Manual (LEM) • New std on system and component numbering • based heavily on nat’l stds • New I&C Chapter; Mech Chapter revised; Roof Std revised • General rev plus added/adding nuclear stds from DOE G 420.1-1, sustainable design, and endnotes to all chapters

  5. Completed Since June 2001 -- Dallas, Con’t Specs Manual • Roofing Specs issued • with thanks to some ESWOG members Drafting Manual • completely revised 10/2001 • Invoked aspects of Nat’l CAD Std • Added P&ID • Tweaked, added Record Floorplan info 6/2002

  6. Completion Expected in FY03 Eng Manual • Fire, Civil, & Arch Chapters -- general revision/upgrade • Struct Chapter Rev • Add IBC2000, 1020-2000, endnotes, new material • Mech Chapter -- Adding SRS B31.3 Piping Guide • Electrical Chapter Revision • enhance telecon and utility (transmission, distribution) • add electrical schematics and connection dwgs • I&C Chapter Revision • add SRS ISA 84.01 and other I&C guidance material • New Security chapter

  7. Completion Expected in FY03, Con’t Specs • Begin Design-Build Performance Spec set upkeep • Glovebox-related Specs -- add • Add new specs, improve commissioning, test and inspection, sustainable design Drafting Manual • Add more content, general improvement, loop and logics, improved panel schedules, layouts, isometrics General • Create LANL-Wide Welding Program • only Construction Contractor has one now • write procedures, pilot, and roll out