New England Roofing Industry Partnership

New England Roofing Industry Partnership. Materials Handling, Rigging, & Cranes. SUBPARTS. Materials Handling, Rigging & Cranes. 1. H,N,O. Training Objectives. After completing this unit, you will: Know the basic OSHA requirements for the storage and disposal of materials.

gladys
Download Presentation

New England Roofing Industry Partnership

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New England Roofing Industry Partnership Materials Handling, Rigging, & Cranes

  2. SUBPARTS Materials Handling,Rigging & Cranes 1 H,N,O Training Objectives • After completing this unit, you will: • Know the basic OSHA requirements for the storage and disposal of materials. • Know hazards in both mechanical and manual material handling. • Understand hazards of rigging and crane operations and how to minimize them. • Be aware of proper lifting techniques.

  3. SUBPARTS Materials Handling, Rigging & Cranes 2 H,N,O References • 29 CFR 1926.250; Subpart H, Materials Handling, Storage, Use, and Disposal • 29CFR1926.500, Subpart N – Cranes, Derricks, Hoists, Elevators, and Conveyors • 29CFR1926.600, Subpart O – Motor Vehicles, Mechanized Equipment, and Marine Operations • ANSI and ASME Standards

  4. SUBPARTS Materials Handling, Rigging & Cranes 3 H,N,O Materials Handling Dangers • Unsafe storage and materials movement can lead to: • Back injuries (the number one cause of worker compensation claims). • Struck-by or crushed by falling loads due to rigging failures. • Electrocutions due to power line contact. • Injury from falling materials. • Injury from slipping, tripping and falling.

  5. SUBPARTS Materials Handling, Rigging & Cranes 4 H, N, O Moving Materials by Hand: Back Facts • 8 out of 10 Americans will have a back injury during their life. • Approximately 1 out of 3 injuries at work are back injuries. • Personal pain and inconvenience can not be measured. • Back injuries cost employers an estimated 10 billion dollars each year!

  6. SUBPARTS Materials Handling, Rigging & Cranes 5 H, N, O Preventing Back Injuries • You can avoid back injuries by: • Using mechanical aids. • Using proper lifting techniques. • Keeping in lifting shape. • Working as a teamwhen lifting. • Knowing the truth about back belts.

  7. SUBPARTS Materials Handling, Rigging & Cranes 6 H, N, O Proper Lifting Technique • Basic moves of a proper lift: • Plan your lift. • Use a wide-balanced stance. • Get close to the load and keep it close to your body. • Tighten your stomach muscles. • Keep your back straight and use your legs. • Turn with with your feet don’t twist your back. • Avoid lifting above shoulder height.

  8. SUBPARTS Materials Handling, Rigging & Cranes 7 H, N, O A Proper Lift

  9. SUBPART Materials Handling, Rigging & Cranes 8 H,N,O Keeping in Lifting Shape • Keeping your stomach and back muscles strong can help prevent back injuries. • Even if you don’t work out in a gym, you can prevent back injuries. • Strength and flexibility exercises should be done at least every other day.

  10. SUBPARTS Materials Handling, Rigging & Cranes 9 H, N, O For Strength and Flexibility

  11. SUBPARTS Materials Handling, Rigging & Cranes 10 H,N,O Mechanical Aids • Use hand trucks, dollies, carts, wheel barrows, and wagons whenever possible. • Encourage management to include mechanical aids whenever possible.

  12. SUBPARTS Materials Handling, Rigging & Cranes 11 H,N,O Mechanical Aids Slab carrying rig here has eliminated bending over and has provided secure non-abrasive hand- holds.

  13. SUBPARTS Materials Handling, Rigging & Cranes 12 H, N, O Team Lifting • Use team lifting for: • Loads too heavy for one person. • Loads too bulky for one person. • Long loads such as pipes and rolls of material. • Talk to your team-mate! • Coordinate your lift!

  14. SUBPARTS Materials Handling, Rigging & Cranes 13 H, N, O What About Back Belts? • The National Institute for Occupational Safety and Health (NIOSH) says: • Back belts may not reduce stress on the back. • May increase blood pressure and heart rate. • May make you think you can lift heavier loads with a belt on and you could get hurt trying to. • If you want to wear a belt; don’t wear it too tight and don’t lift more than you usually would.

  15. SUBPARTS Materials Handling, Rigging & Cranes 14 H,N, O Material Storage • Five basic rules for safe storage: • Keep total weight within the safe loading limits of the building’s floors. • Keep passageways clear. • Control materials so they do not slide, fall, or collapse. • Provide cribbing for heavy loads on unstable surfaces. • Store materials away from traffic.

  16. SUBPARTS Materials Handling, Rigging & Cranes 15 H,N,O What Does OSHA Require? • Basic requirements: • Don’t put materials within 10 feet of roof edge. • Don’t store materials on scaffolds or runways. • Keep materials at least 6 feet from floor openings and hoistways. • Keep aisles clear. • Keep work area free from tripping, fire, explosion, pest and vegetation hazards.

  17. SUBPARTS Materials Handling, Rigging & Cranes 16 H,N,O OSHA Also Requires • Specific requirements: • Stack bagged materials by stepping back the layers and cross-keying the bags at least every 10 bags high. • Stack bricks no higher than 7 feet. • Taper masonry blocks back one-half block per tier for stacks above 6 feet. • Stack lumber on sills and on level solid ground - never exceed 16 feet high and always remove nails!

  18. SUBPARTS Materials Handling, Rigging & Cranes 17 H,N,O Setting Materials on the Deck What could happen to these stacked materials?

  19. SUBPARTS Materials Handling, Rigging & Cranes 18 H,N,O Disposal of Waste Material • OSHA requirements: • Scrap lumber, waste and trash must be regularly removed from the work area. • Burning must meet local regulations. • Materials dropped more than 20 feet require a chute. • Solvent waste, oily rags, and flammables must be kept in fire resistant containers until removed. • If the waste is considered hazardous, your employer will have to follow federal, state, and local regulations.

  20. SUBPARTS Materials Handling, Rigging & Cranes 19 H ,N, O Debris Chutes Objectives in using a chute: material control, dust control and protection of workers and bystanders – note the differences here….

  21. SUBPARTS Materials Handling, Rigging & Cranes 20 H, N, O Mechanical Materials Handling • Depending on the job, you might use or work around: • Buggies • Roof Hoists • Conveyors • Skid-steers (“Bobcats”) • Rough Terrain Forklifts (“Lulls”) • Cranes

  22. SUBPARTS Materials Handling, Rigging & Cranes 21 H, N, O Buggies What are the safety concerns while moving materials with these?

  23. SUBPARTS Materials Handling, Rigging & Cranes 22 H, N, O Mechanical Equipment on Flat Roofs • Will the deck support the weight of the equipment? • Has the equipment been inspected? • Are all equipment guards in place? • Is the operator trained? • See Subpart C - .20(b)(4) • Are all aware that the equipment is not to be operated outside warning lines due to the fall hazard? • See Subpart M - Fall Protection -.502 • Closest approach is 6 feet parallel and 10 feet perpendicular to direction of travel.

  24. SUBPARTS Materials Handling, Rigging & Cranes 23 H, N, O Roof Hoists What are the manufacturer’s instructions for set up & use? What does OSHA say?

  25. SUBPARTS Materials Handling, Rigging & Cranes 24 H, N, O Roof Hoist Safety Concerns • .552(a)(1) Compliance with manufacturer’s specifications and limitations. • .552(a)(2) Load capacity, hazard warnings and instructions must be posted. • .552(a)(3)(i-iv) Wire rope replacement criteria. • .552(a)(4) Hoist rope is to be installed in accordance with manufacturer’s instructions. • .501(b)(3) Fall Protection (Subpart M) in hoist area.

  26. SUBPARTS Materials Handling, Rigging & Cranes 25 H, N, O Is the Hoist Operator Protected?

  27. SUBPARTS Materials Handling, Rigging & Cranes 26 H, N, O Using Conveyors to Move Materials

  28. SUBPART Materials Handling, Rigging & Cranes 27 H, N, O Safety Concerns In Conveyor Use • Set up and used in accordance with the manufacturer’s instructions? • Guards in place on pinch points? • Power line clearances maintained? • Maintenance program in place?

  29. SUBPART Materials Handling, Rigging & Cranes 28 H, N, O Safety Concerns In Conveyor Use • No riders on conveyor! • .555(a) Means for stopping motor at operator’s station and start up warning. • .555(a)(5) Protection for workers below against falling objects. • .555(a)(7) Lockout/Tagout for maintenance.

  30. SUBPART Materials Handling, Rigging & Cranes 29 H, N, O Using Conveyors to Move Materials Power line clearance? Back up alarm or signal person? Fall protection for roof workers?

  31. SUBPARTS Materials Handling, Rigging & Cranes 30 H, N, O Using Skid Steers • If on the roof – will it take the load? • Is the operator qualified? • .20(b)(4) – Again! Training is available from some manufacturers. • Skid Steers are powerful, work in close quarters with people and are very quick, with large areas where the operator cannot see (the “no-zone”). • Is the work area adequately barricaded?

  32. SUBPARTS Materials Handling, Rigging & Cranes 31 H, N, O Skid Steer Loader What do we need to know about this operator?

  33. SUBPARTS Materials Handling, Rigging & Cranes 32 H, N, O Operator sight distances from eye level to ground The “NO-ZONE” 11’ 7” Eye level 5 ft - 5 in above ground level 11’ 5” 21’ 8” 4’ 10” 6’ 1” 3’ 1” Vehicle: S-44 Bobcat 6’ 3”

  34. SUBPARTS Materials Handling, Rigging & Cranes 33 H, N, O Using Forklifts to Move Materials • What do we need to know? • Is the operator trained? • See .602(d) • Has the machine been inspected and properly maintained? • Is the backup alarm audible? • Are ground personnel protected? • Is the balanced load within capacity? • Are workers on roof protected from falls?

  35. SUBPARTS Materials Handling, Rigging & Cranes 34 H, N, O Getting Materials to the Roof How can we protect against falls in these situations?

  36. SUBPARTS Materials Handling, Rigging & Cranes 35 H, N, O Using Forklifts What precautions need to be taken around the machine’s operating area?

  37. Materials Handling, Rigging & Cranes SUBPARTS H, N, O TS 36 N, O Operator sight distances from eye level to ground Eye level 7 ft - 3 in above ground level 85’ 0” 18’ 2” 10’ 9” 7’ 9” 3’ 0” 39’ 0” The “NO-Zone” 21’ 2” 14’ 10” Vehicle: R-14793 High Reach Fork Lift

  38. SUBPARTS Materials Handling, Rigging & Cranes 37 H, N, O Platforms on Forklifts • If you work off of some attachment it must: • (1) Be secured to forks. (2) Have a guardrail. • (3) Have a Personal Fall Arrest System tie-off. • (4) Used only while the operator is in the seat.

  39. SUBPARTS Materials Handling, Rigging & Cranes 38 H, N, O Rigging and Crane Safety • Rigging is the lines or cables used to lift and move materials by hoisting with a crane. • A rigger is a skilled mechanic who prepares heavy equipment or loads of material for movement.

  40. SUBPARTS Materials Handling, Rigging & Cranes 39 H, N, O Examples of Rigging

  41. SUBPARTS Materials Handling, Rigging & Cranes 40 H, N, O The Hazards of Rigging • Possible contact with power lines. • Rigging failures due to overloaded, improper, or defective rigging. • Out of control loads. • Being struck by the crane’s swing radius.

  42. SUBPARTS Materials Handling, Rigging & Cranes 41 H, N, O Can Anyone Rig or Lift Loads? • Rigging must be done under the supervision of a Competent Person. • The crane operator must be highly qualified and certified. • Improper rigging or unqualified operators can be deadly!

  43. SUBPARTS Materials Handling, Rigging & Cranes 42 H, N, O The Rigger’s Duties • The rigger selects the rigging. • The rigger sets-up the rigging. • The rigger directs the lift.

  44. SUBPARTS Materials Handling, Rigging & Cranes 43 H, N, O OSHA Rigging Requirements • All slings and hardware must be manufactured to meet demanding specifications which include safety factors. • All web or alloy chain slings must be clearly stamped, marked, or labeled, for capacity. • OSHA prohibits job made: slings, hooks, links, and fasteners formed from bolts. • Before each use all components must be inspected by a Competent Person.

  45. SUBPARTS Materials Handling, Rigging & Cranes 44 H, N, O Safe Working Load (SWL) • The maximum load allowed on rigging is the Safe Working Load (SWL). • The sling may actually be able to hold 5 times the SWL. • A safety factor is the ratio of the ultimate strength to the SWL. • If a rigger exceeds the SWL, then they lose some of the safety factor.

  46. SUBPARTS Materials Handling, Rigging & Cranes 45 H, N, O Knowing Safe Working Loads

  47. SUBPARTS Materials Handling, Rigging & Cranes 46 H, N, O Sling Angle • The safest sling angles are greater than 450 from the horizontal.

  48. SUBPARTS Materials Handling, Rigging & Cranes 47 H, N, O Rigging the Load Sling angles <450, load unstable, worker not protected. Balanced load; sling angle >600

  49. SUBPARTS Materials Handling, Rigging & Cranes 48 H, N, O Working Safely Around Rigging • General safety practices: • Keep at least ten feet away from power lines up to 50 kV. • Increase power line clearance distance by .4” per kV >50kV • Never hoist loads over workers. • Never stand too close or under a load. • Never ride a load.

  50. SUBPARTS Materials Handling, Rigging & Cranes 49 H, N, O Working Safely Around Rigging2 • General safety practices: • Use tag lines to control loads while lifting. • Test lift the rigging. • Use proper equipment, make sure it is marked, not home-made, and in good shape.