1 / 17

BSA MODULE ACTIVITIES

BSA MODULE ACTIVITIES. BSA Team composition. Silvia. Sandro e Biagio. Giuseppe. Mario. BSA module composition. U. C. M. Ago. S. Nicola. C. Cosmo. Team Leader DPC. Deputy TL DPC. IT + TC DPC. Campania. Andrea. Luigi. C. Giancarlo. Marche. M. Sicily. S. M. Umbria. U.

glyn
Download Presentation

BSA MODULE ACTIVITIES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BSA MODULE ACTIVITIES

  2. BSA Team composition

  3. Silvia Sandro e Biagio Giuseppe Mario BSA modulecomposition U C M Ago S Nicola C Cosmo Team Leader DPC Deputy TL DPC IT + TC DPC Campania Andrea Luigi C Giancarlo Marche M Sicily S M Umbria U U U S C Angelo Francesco Rudolf Paolo

  4. On site transportation 2 VANs, Renault Trafic9 pax each 1 rented car … inspectionswere made with cars of Greekexperts

  5. Arrival, camp mounting and delivery of equipment

  6. BSA Moduleoperationalactivity Meeting between TL (pre-team) and LEMA to defineactivities Meeting between BSA module and LEMA to assemble teams

  7. Coordinamento con modulo ASA Coordinamento con modulo STC

  8. SafetyAssessment From 3/10 16h00 to 4/10 17h00 12 teams (1 IT expert + 1 GR expert) 6 teams for rapidinspections (inspection) 6 teams for secondaryinspections (reinspection) About 3 inspectionsper team on 3/10 About 6 (re)inspectionsper team on 4/10 Total of 102 inspections

  9. Usedforms Inspection (GR) Aedes form (IT) Reinspection (GR)

  10. Equipment of BSA Module

  11. Trackingsystem (local GSM card)

  12. Results of the assessment Rapidinspections 56 Usable 31 55% Notusable 25 45% Reinspections 46 Usable 11 24% temporaryunsuable 32 70% Unusable 3 6%

  13. Meeting of BSA moduleat end of dailyactivity Meeting between BSA-TL with LEMA at end of dailyactivity

  14. Departure from Port of Patras Back

More Related