1 / 9

ASA Module activities

ASA Module activities. Targeted to the evaluation of strategic and/or complex structures.  Dedicated instrumentation  Technical procedures the ASA module has been conceived to be able to either inter-operate with the other BUILD-SAFE modules or work independently.

Download Presentation

ASA Module activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASA Module activities

  2. Targeted to the evaluation of strategic and/or complex structures.  Dedicated instrumentation  Technical procedures the ASA module has been conceived to be able to either inter-operate with the other BUILD-SAFE modules or work independently Advanced Seismic Assessment module (ASA)

  3. Remote Central Unit Assessor teams Fast/Simplified modeling Mobile Unit Experimental team operative unit for advanced structural assessment Advanced data management and telepresence coordination and multi-expertise support centre Transmission system

  4. Instrumentation for experimental tests Thermo graphic scanner Georadar, Laser scanner High definition digital camera set Pachometer, Sclerometer Laser meter, Micrometer Endoscopic device Sonic device Mechanical exciter Accelerometers/velocimeters Inclinometer (10 Jewell) Flat jack test equipment Geophones Impulse hammer (impulsive excitation) Portable Data acquisition system Seismic profiling equipment

  5. The mobile unit at BoO

  6. Pirelly factory Port authority building 2 buildings analysed

  7. Experimental measurements at Port authority building

  8. Evaluation and reporting at BoO Final results delivered to LEMA 2 reports, 40 pages long, on measurements and evaluation of the building residual capacity Back

More Related