1 / 26

Use Case I Project Initiation

Process Flow for Use Case 1 Project Initiation. (Outside of accelerator) The Line of Business Owner (LBO) decides to create a content (e.g., news story, movies, TV show, etc).LBO logs into the accelerator. Creates a new request for Content Ingest Initiator (CII). He provides the following info

glynis
Download Presentation

Use Case I Project Initiation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Use Case I Project Initiation The Line of Business Owner

    2. Process Flow for Use Case 1 Project Initiation (Outside of accelerator) The Line of Business Owner (LBO) decides to create a content (e.g., news story, movies, TV show, etc). LBO logs into the accelerator. Creates a new request for Content Ingest Initiator (CII). He provides the following information: Job description, due date, job id (system created), job priority (1-5, with 5 as immediate) and defines one or more distribution channels (e.g., web, mobile, verizon, amazon, hulu, cablevision, etc). LBO also sees all prior requests with the status information (status (Failed, Completed, Active), completion date, CII comments, current process step/status/owner). They can cancel or edit job details at any point. LBO logs out.

More Related