150 likes | 165 Views
Learn how to manage erosion and construction challenges for building dream homes. Explore permit requirements, wetland regulations, and erosion control plans for a successful project. Get expert advice and contact information for further assistance.
E N D
Dream Homes & Drainage Nightmares: Erosion Control for Residential Construction Sites NYSDOS Codes Division #49-5311 Course Record #02-07-0354
SITE AIR PHOTOAccess on Town Roadwoodlandsexisting neighborwetlandschanging topographySlide #1
PROPOSED HOUSE●Long, winding drive for privacy● house and huge lawn● clear view of wetland – too many trees in the way● Place for tops disposal● Water source for lawnSlide #2
SITE AIR PHOTO with proposed housePermit needs:drivewayseptic systemwetlandsbuilding permitPhase II Construction permitSlide #3
SITE AIR PHOTO with wetlandsNote the state designated wetlands with 100 foot buffersteep slopes over 25%Slide #4
SITE AIR PHOTO with wetlands as an overlayNote the state designated wetlands with 100 foot buffersteep slopes over 25%Slide #5
SITE SLOPESNote contoursand steep slope over 25% indicated in yellowSlide #6
PROPOSED HOUSEhalf mile of road =about 2 acreslarge lawn =about 5 ½ acresSlide #7
BETTER LAYOUTShorter, narrower drivesmaller lawntotal development = just under 1 acreSlide #8
SITE AIR PHOTOStill private drivegood viewsmake woodchip path to the marshSlide #9
WHERE TO GET MORE INFO: • NYSDEC WEBPAGE: www.dec.ny.gov • TALK TO PAULA SMITH • 585-226-5452 pxsmith@gw.dec.state.ny.us • TALK TO SCOTT RODABAUGH • 607-739-0809 sarodaba@gw.dec.state.ny.us • CONTACT SOIL AND WATER CONSERVATION • Chemung 607-739-2009 markwatts@stny.rr.com • Schuyler 607-535-9650 swcd@stny.rr.com • Steuben 607-776-7398 x 3 jgparker@stny.rr.com Slide #14