An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SILENT RAIL FREIGHT IN THE NETHERLANDS Pieter Dronkert Dep of Transport, Rail Freight Divison 25 okt 2005

  2. Co-operation 2 Departments and Infra Managers Started 2002, Ends 2007 Total budget: € 110 mln. Development and Implementation Cost-Effective Measures Road and Rail IPG: Dutch Noise Innovation Program

  3. Co-ordinated by ProRail (IM) Budget: € 25 mln Focussed on Track and Rolling Stock Renewed focus: Implementation of Silent Rolling Stock IPG-Rail

  4. - Fixed Noise Measure Spots - Tuned Raildamper - Acoustic Grinding - Retrofit Project(s) IPG-Rail: Successes

  5. Tuned Raildamper

  6. Cast Iron Blocks: Rugged Wheels cause more Noise Whispering Train: K-block project LL-blocks: pilot project(s) IPG-Retrofit: Composite Brake Blocks

  7. Target: More Information about Retrofitting with K-blocks and Noise Reduction of 7-10 dB Acoustic Measures and Effects Life Cycle Cost Retrofit costs Whispering Train Project: K-Blocks

  8. - Noise reduction: 9 dB for K-Blocks and Wheel Dampers togehter - Another 1 dB for TKS-spring - Costs Retrofit: € 6.000,- for K-blocks - LCC: frequent replacement needed due to asymmetric wear First ResultsWhispering Train Project

  9. IPG: looking for 2 pilots Testing all 3 released LL-blocks Start: beginning 2006 Halfway 2007: results Target pilots: more information and permanent release LL-blocks LL-pilot(s)

  10. With K-blocks: expensive With LL-blocks: hopeful development need permanent release do pilots etc Retrofitting Freight Wagons

  11. Possibilities: EU- or National Financial Support Retrofitting Discount on Track Access Charge Noise Production Limits Implementation Silent Freight Wagons

  12. EU 2001/14: discount TAC possible Discount TAC incentive for Operators to Retrofit Dependent on availability and success LL-blocks Discount on Track Access Charge

  13. www.innovatieprogrammageluid.nl www.fluistertrein.nl both available in english Links: