An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Controls Review • Want to record a full configuration of the experiment at every possible “event”, including controls data. • Event trigger = accelerator clock (or something very close) • Systematics handles: • Using the beam itself: calibration runs • Experiment staging and component combinatorics • Defining tolerances • Areas: • Beam shape and content • Trackers and detectors • Cooling channel

  2. Assumptions • Stated Goal: eout/ein of  10 –3 • Assume there will be a standard (or agreed to) definition of 6-D cooling. • Assumethat the tracker can give us precision particle position and momemtum that this won’t contribute significantly to the error. • Assume particle ID < 1% error • The main sources of systematic errors are in the cooling channel and detector solenoids, which will need to be under control to a level such that up to 10 independent sources of systematics will be < 10-3 • Suggested goal to keep each source of error <3*10-4 level

  3. Quantity MICE organs Tolerance Monitor Beam measurement (suggested) Responsible Channel count Beam ISIS beam target magnets Collimators Diffuser… TBD Alignment with expt? Settings Beam instrumentation (profile & halo monitors ?) others Measure beam averages and correlations, composition and emittance With/without diffuser Drumm/Tilley Beam detectors TOF Cherenkov TBD Volts, currents Occupancies, Dead channels others Measure TOF vs nominal beam momentum Calibrate in configuration with electrons in beam ? Palladino/ Bonesini Summers Emittance tracker <<10-3 TBD Compare one tracker to the other with empty abs and no RF Bross/ Long PID 10-3 TBD Palladino/ Bonesini Gregoire Tortora DE/dX Hydrogen absorber A few 10-3 Temperature Pressure thickness Others Measure energy difference in configuration without RF and with full absorber(s) Zisman Wing Lau MACC Ishimoto DE RF system A few 10-3 Volts Phases Temps Measure energy of outgoing muons vs phase or with/without RF Zisman Derun Li optics positions of coils internal survey some mm ISIS alignement system position monitors? transfer matrix: (pt, pL, phi, x0 , y0)in <-> (pt, pL, phi, x0, y0)out measure with no RF and empty absorbers each time one changes the magnetic set-up. Green /Black currents few 10-4 amp-meter Zisman / Green mag field some 10-4 ~ mag probes temp probes Zisman/Green / Linde • Start-up systematics chart

  4. MACC’s experimental controls channel list

  5. Beamline Static = not expected to change with time (but may drift) Dynamic = changing with time ISIS proton beam trigger (pulse) and intensity (voltage level) (dynamic) ISIS proton beam loss monitors - ×few - voltage level, 20 ms cycles (dynamic) Target position (static) Target drive amplitude (dynamic) Target drive trigger (pulse) Beam Diagnostics: yet to be determined -Glasgow are looking at scintillators - X,Y beam profiles (N channels - dynamic) Settings of magnets (V, I) × 12 elements (static) = 9 quads, 2 dipoles, 1 sc-solenoid (static) Beam Line Vacuum (e.g. penning & pirani) Diffuser in place Vacuum state: = rough pump on/off = turbo pump on/off         = valves open/closed (×2)

  6. Particle ID – Cerenkov (2) - 8 analog channels for monitoring the (positive) HV's.- 8 analog channels for monitoring the analog responses of PM's to light pulses.- 1 digital output channel for triggering the light pulser - 8 TDC outputs (probably not important? depends on the noise levels).- 1 analog for oxygen sensor - 1 analog channel for monitoring the humidity inside the vessel. - 1 analog channel for a temperature probe- 1 analog channel for the He pressure inside the Cherenkov vessel. - 2 switches (over and underpressure)

  7. Controls for Cerenkov (2)

  8. PID – TOF(2) To measure t.o.f. with s ~ 70 ps, it is necessary to monitor detector status, environmental conditions (e.g., temperatures for signal cables) • HV setting ( ~ 80 channels) via CAEN SYS1527-SYS3527 mainframes • Temperature probes (~3) • Magnetic field probes (~3) • Additional (laser interlock, other.. ) Less than 100 channels to be under cold control system

  9. PID - Calorimeter Now ~ 240 pairs