An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CAPS CAPACITY OPTIMIZATION PLANNING SYSTEM

  2. INTRODUCTION • Semiconductor integrated circuit manufacturing: • Very complex process • Hundreds of operations • Several hundred sets of tools • Price of tools is very high ($1- $10 million) • Accurate capacity planning is very critical

  3. MANUFACTURING PROCESS • Chemical Clean • Oxidation • Photolithography • Chemical Etch • Ion Implant • Metal/Insulator Deposition • Anneal

  4. IBM PROBLEM • Need to plan capacity one year in advance of the expected demand • Find the best product mix with existing capacity • Assessing tool capacity by product mix (a complex process) • Current planning approach not very efficient (spreadsheets, simulations)

  5. CAPS • Helps identify tool capacity required to meet the demand • Helps volume mix of products to maximize profit

  6. IMPLEMENTATION • Solver: IBM Optimization Solutions and Library (OSL) on a Unix server • Graphical User Interface on a PC client • Input data automatically formatted and downloaded from tool-planning database • Variables: 3,500 – 5,500 • Constraints: 1,600 – 2,400 • Products: 1 – 40 • Solution time: 18 – 30 seconds

  7. BENEFITS • Many scenarios can be analysed in hours versus days • 10s of millions of Dollars in savings • Comprehensive reports enabling analysis • Enables a quick utilization of scenarios to maximum capacity

  8. DEFINITIONS • 50 Products, each 400 to 600 operations • Tools; same operations, different speeds • 100s Tool Groups (identical tools) • Parallel, unrelated T.G. • T.G. with common operations: Cascade • T.G. w/o common operations: NonCascade • Identify bottlenecks or gating T.G. • Preferred order of T.G. in C.G.

  9. CASCADE TOOLS TG 1 TG 3 1, 2, 5, 6 9, 10 TG 2 12 1, 2, 3, 4 1, 2, 7, 8 11

  10. NON-CASCADE TOOLS TG 4 TG 5 13, 15, 18, 19 14, 16, 17

  11. PENALTY FUNCTION

  12. MATHEMATICAL MODEL Max s.t.

  13. MINI-CASE • # Cascade Tool Groups = 3 • # Operations in C.G. = 12 (1,…, 12) • # Non-Cascade Tools = 2 • # Operation in N-C.G = 7 (13,…, 19) • # Products = 3 • Available time = 480 Min./Day • # Variables = 306 • # Constraints = 109 • Solution Time < 1.0 Sec.

  14. CASCADE GROUPS

  15. TIME RATIOS

  16. Operation Time (Cascade Tools)

  17. Operation Time (Non-Cascade Tools)

  18. SCENARIO 1

  19. SCENARIO 2

  20. SCENARIO 3

  21. SCENARIO 4

  22. RESULTS

  23. RESULTS (Cont.)

  24. LIMITATIONS • Does not consider: • Inventory • Stochastic demand