1 / 24

MI Performance and Plans

MI Performance and Plans. Ioanis Kourbanis Beams/MI. $29 Stacking Cycles. Typical stacking intensities are 4.5-4.8E12 We have performed a series of emittance measurements to understand the beam quality at injection and extraction.

Download Presentation

MI Performance and Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MI Performance and Plans Ioanis Kourbanis Beams/MI AAC Review May 13-15, 2002

  2. $29 Stacking Cycles • Typical stacking intensities are 4.5-4.8E12 • We have performed a series of emittance measurements to understand the beam quality at injection and extraction. • There is a 20% horizontal emittance blow-up through the cycle and a factor of 2 blow-up in the longitudinal emittance mostly at transition. AAC Review May 13-15, 2002

  3. $29 Cycle Intensity AAC Review May 13-15, 2002

  4. $29 Longitudinal Emittance vs Energy AAC Review May 13-15, 2002

  5. $29 Horizontal Emittance vs Energy AAC Review May 13-15, 2002

  6. $29 Vertical Emittance vs Energy AAC Review May 13-15, 2002

  7. $2B Proton Coalescing Cycles • Currently we are coalescing 7 Booster bunches into one bunch with typical intensities of 280-320 E9 ppp. • Typical coalescing efficiencies are 75-80% with 12-15% in DC beam and 8-10% in sattelites. • Booster mode dampers are essential for the $2B operation at high intensities. • Dispersion has to be taken into account when we calculate the horizontal emittance of the coalesced beam. • There is a 20% blow-up in transverse emittance and a 30% in the longitudinal emittance through the cycle. AAC Review May 13-15, 2002

  8. Proton Coalescing Intensities AAC Review May 13-15, 2002

  9. Proton Coalescing Intensities (2) AAC Review May 13-15, 2002

  10. $2B Horizontal Emittances vs Intensity AAC Review May 13-15, 2002

  11. $2B Horizontal Emittance vs Number of Bunches Coalesced AAC Review May 13-15, 2002

  12. $2B Horizontal emittances vs Intensity AAC Review May 13-15, 2002

  13. $2B Longitudinal Emittance vs Time AAC Review May 13-15, 2002

  14. Effect of Booster Mode Dampers on $2B Injection AAC Review May 13-15, 2002

  15. $2A Pbar Coalescing Cycle • Currently we are accelerating and coalescing 4 pbar batches of 7-11 bunches each. • The Acceleration efficiency is greater than 99% and the coalescing efficiency varies between 65-90% depending on the longitudinal emittance of each pbar batch. • There is 20% horizontal emittance blow-up through the cycle while the longitudinal emittance blow-up varies between 30-60%. • Beam loading during coalescing is affecting the longitudinal emittances of the pbar bunches. AAC Review May 13-15, 2002

  16. Pbar Intensities AAC Review May 13-15, 2002

  17. Pbar Horizontal Emittance vs Energy for 5 Different Stores AAC Review May 13-15, 2002

  18. Pbar Longitudinal Emittances vs Energy for one Store AAC Review May 13-15, 2002

  19. Pbar Longitudinal Emittance after Coalescing vs Batch Number AAC Review May 13-15, 2002

  20. Pbar Coalescing AAC Review May 13-15, 2002

  21. Feed-Forward Beam Loading Compensation • Recently we implemented feed-forward beam loading compensation in all 18 53Mhz rf stations. • Currently the compensation is operational at 150 GeV during proton coalescing and provides 20-25 db reduction to beam loading. • Leakage through the up-convert module currently prevents us from turning off the 53 MHz stations during the second segment of coalescing (2.5 MHz rotation). • We have started studies in order to implement the feed-forward during pbar coalescing. AAC Review May 13-15, 2002

  22. Beam induced signal with and without Feed-forward AAC Review May 13-15, 2002

  23. Effect of Beam Loading Compensation on Debunching During Proton Coalescing AAC Review May 13-15, 2002

  24. Future Studies and Plans • Understand and Correct the Horizontal Emittance Blow-up during Acceleration. • Measure the horizontal emittance during acceleration using flying wires and ion profile monitors. • Calibrate and measure the tunes through the $29 and $2B cycles. • Understand and Correct the Longitudinal Emittance Blow-up. • Debug the feed-forward Beam Loading Compensation and make it operational during Proton and Pbar Coalescing. AAC Review May 13-15, 2002