1 / 6

Information for the training-cum-workshop on PRIASoft on 16.09.2010 at Bhubaneswar

Information for the training-cum-workshop on PRIASoft on 16.09.2010 at Bhubaneswar. Status of GP Computerisation. Status of GP Computerisation. Status of implementation of PRIASoft. Zilla Panchayat

gusty
Download Presentation

Information for the training-cum-workshop on PRIASoft on 16.09.2010 at Bhubaneswar

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information for the training-cum-workshop on PRIASoft on 16.09.2010 at Bhubaneswar

  2. Status of GP Computerisation

  3. Status of GP Computerisation

  4. Status of implementation of PRIASoft Zilla Panchayat • The Master of Treasury, Post Office and all Bank branches (147) of Balasore Dist have been created. • The Opening Balance as on 1.04.2010 has been entered in all schemes (12 ). • 15 no. of receipt and 86 no. of payment vouchers have been entered. Block Panchayat • 11 Blocks out of 12 have entered their Master data. • 11 Blocks out of 12 have entered their Opening Balance. Village Panchayat • 283 panchayats out of 289 have entered their Master data. • 47 panchayats out of 289 have entered their Opening Balance. • 1 panchayat has entered voucher.

  5. Problem faced during data entry • Transfer /Expn. of funds through advice is not available. • Only one mode of advance/transfer i.e. Infrastructure in SGSY scheme is showing under Head. Three other modes like Subsidy, Training & Revolving are not showing, which may kindly be included. • In BGJY, it is not possible to enter Receipt voucher as nothing is coming in Scheme/component. Further this scheme is not showing in Payment voucher. • The figure in Opening Balance is changing automatically, even it is changing to zero in case of P.L. A/c. • Some schemes like State Relief Fund, FDR Grant, UNICEF, Misc are not available, which may be included. • In Scheme wise Cash Book report if the –To date is greater than –From date, the report is not coming and showing one error message. • In Scheme wise Cash Book report, the OB, CB is not coming correctly.

  6. Thank You

More Related