Schedule for mockup assembly

Schedule for mockup assembly. SPE, gain measurement & HV setup. Pre. Analysis. Data taking with sources & Analysis. LS filling. Measurement of SPE, gain. Source Calibration. SPE with diffuse ball. Data Analysis. Gd mass production and Loading. Mockup assembly

guy-emerson
Download Presentation

Schedule for mockup assembly

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Schedule for mockup assembly SPE, gain measurement & HV setup Pre. Analysis Data taking with sources & Analysis LS filling Measurement of SPE, gain Source Calibration SPE with diffuse ball Data Analysis Gd mass production and Loading

  2. Mockup assembly • LS filling : 이재승, 박정식, 박강순 •  Target, Gamma catcher 는 완료 (각각 150L, 802L : G.C. 목(chimney 시작부분) 까지) •  나머지 buffer (mineral oil)는 오늘 중으로 모두 채울 예정 ( 현재 4233L : G.C. 목 까지 ) • On going processes for Mockup daq • SPE measurement with diffuse ball : 백승록 •  각 채널의 PMT gain 측정  HV 값 수정 • Dark current measurement : 정인석 •  rate measurement : random trg 경우 •  fitting 결과를 Hamamatsu 데이터와 비교 • Set the MC parameters : 정인석 • Event Build : 백승록 • Converting data format & preparing manual for how to use it : 박정식 •  Raw data format  final data format • Energy calibration with sources : 백승록, 정인석, 김동현, 박정식

  3. LS filling Gamma catcher Target Buffer Target 적산계 LS filling Flowmeters

  4. LS filling 1 1 2 3 2 3

  5. 1 Chimney에 후레쉬 삽입 동영상 2 3