Report from the Scientific Project Manager

Report from the Scientific Project Manager. 8th COSMO GENERAL MEETING 18 – 21 September 2007 Glyfada, Greece Tiziana Paccagnella ARPA-SIM. Report from the Scientific Project Manager. Scientific activities will be presented by WP coordinators and by our colleagues. Coordination.

guy
Download Presentation

Report from the Scientific Project Manager

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report from the Scientific Project Manager 8th COSMO GENERAL MEETING 18 – 21 September 2007 Glyfada, Greece Tiziana Paccagnella ARPA-SIM COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  2. Report from the Scientific Project Manager Scientific activities will be presented by WP coordinators and by our colleagues. COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  3. Coordination • 18th Meeting of the COSMO STC Zürich, December 14-15, 2006 • 14th Meeting of the COSMO SAC Zurich, MeteoSwiss 9-11 May 2007 • 15th Meeting of the COSMO SAC Offenbach, DWD 4-5 Sept 2007 • 19th Meeting of the COSMO STC Glyfadat, General Meeting 2007 & WGs and Projects meetings & Reporting COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  4. SACs 14th Meeting of the COSMO SAC Zurich, MeteoSwiss 9-11 May 2007 Participants: Christoph Schraff Michael Baldauf Marco Arpagaus Pierre Eckert Adriano Raspanti Ulrich Schaettler Tiziana Paccagnella Mathias Rotach Andrzej Mazur Poland Victor Pescaru Romania Riviv Gdaly Russia 15th Meeting of the COSMO SAC Offenbach, DWD 4-5 Sept 2007 Participants: Christoph Schraff Michael Baldauf Marco Arpagaus Pierre Eckert Adriano Raspanti Ulrich Schaettler Tiziana Paccagnella Mathias Rotach Andrzej Mazur Poland Victor Pescaru Romania Mikhail Tsyrulnikov Russia Hayo Koppert Germany COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  5. SACs 14th Meeting of the COSMO SAC Zurich, MeteoSwiss 9-11 May 2007 Participants: Christoph Schraff Michael Baldauf Marco Arpagaus Pierre Eckert Adriano Raspanti Ulrich Schaettler Tiziana Paccagnella Mathias Rotach Andrzej Mazur Poland Victor Pescaru Romania Riviv Gdaly Russia 15th Meeting of the COSMO SAC Offenbach, DWD 4-5 Sept 2007 Participants: Christoph Schraff Michael Baldauf Marco Arpagaus Pierre Eckert Adriano Raspanti Ulrich Schaettler Tiziana Paccagnella Mathias Rotach Andrzej Mazur Poland Victor Pescaru Romania Mikhail Tsyrulnikov Russia Hayo Koppert Germany COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  6. SACs 14th Meeting of the COSMO SAC Zurich, MeteoSwiss 9-11 May 2007 Participants: Christoph Schraff Michael Baldauf Marco Arpagaus Pierre Eckert Adriano Raspanti Ulrich Schaettler Tiziana Paccagnella Mathias Rotach Andrzej Mazur Poland Victor Pescaru Romania Riviv Gdaly Russia Re-evaluate the COSMO strategy on data assimilation COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  7. Data Assimilation 15th Meeting of the COSMO SAC Offenbach, DWD 5 Sept 2007 COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  8. Data Assimilation COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  9. The Short Range Numerical Weather PredictionProgramme of EUMETNET 13th SRNWP Meeting12 October 2006, Zurich (Switzerland) Three topics have been selected as SRNWP Projects that should accompany the SRNWP Programme, with a dedicated financing for each Project. They are: • - Interoperability (Uli Schaettler) The term “Interoperability” was chosen for the ability of the different modelling systems to “work together” • - European multi-model LAM EPS (Chiara Marsigli) • - Model Verification (Pierre Eckert) Jean Quiby will illustrate the present status of these projects COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  10. SACs The allocation of qualified human resources to the some of the Priority projects is still failing. Some concurrent actions must be take to overcome this problem: • Reduce the number of the projects • Increase substantially the percentage of FTE per person. For the success of the most difficult projects, full time scientists would be required. Considering the present situation, full time will not probably be possible but an high percentage (above 50%) must be allocated. • Training must be part of the project itself, of course when required. The FTEs offered by the COSMO members, if not expert on the specific topics, must have at least the appropriate background as a pre-requisite to be trained. • COSMO needs more specialists in Numerics and Physics • The projects for the next COSMO year must be planned/revised in this optic. COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  11. SACs • COSMO visibility: the COSMO web site is still suffering ! COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  12. 2005-2006 2006-2007 SUPPORT ACTIVITIES – WG6 SIR 1DVAR FOR SATELLITE DATA LM_Z COSMO Priority Projects RK UTCS SREPS INTERPRETATION/ Verif. VHR INTERPRETATION TACKLE DEFICIENCES IN QPF COMMON VERIFICATION – CONDITIONAL VERIFICATION COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  13. COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  14. COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  15. GM GM 2007 2008 SUPPORT ACTIVITIES – WG6 Re-designed following the outcome of the Brainstorming SIR ? LM_Z QPF COSMO Priority Projects 1DVAR FOR SATELLITE DATA UTCS UTCS SREPS INTERPRETATION/ Verif. VHR RK COMMON/CONDITIONAL VERIFICATION COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  16. Next steps to Projects definition: • Projects formulated at the end of GM • Commitments from STC members to project leaders before October the 15th - The project leaders will interact directly with STC members as regards the allocation of FTEs on the different project tasks. COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September

  17. Thanks to