Report from the Scientific Project Manager

Report from the Scientific Project Manager. 7th COSMO GENERAL MEETING 18 – 21 September 2006 Bucharest Tiziana Paccagnella ARPA-SIM. Report from the Scientific Project Manager. Scientific activities will be presented by WP coordinators and by our colleagues.

myra
Download Presentation

Report from the Scientific Project Manager

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report from the Scientific Project Manager 7th COSMO GENERAL MEETING 18 – 21 September 2006 Bucharest Tiziana Paccagnella ARPA-SIM COSMO General Meeting 2006 - Bucharest

  2. Report from the Scientific Project Manager Scientific activities will be presented by WP coordinators and by our colleagues. I will report only general comments about our activities during the past year COSMO General Meeting 2006 - Bucharest

  3. Boundary Conditions for activities planning in COSMO Perspectives in European Numerical Forecasting • GCM 10 km horiz. resolution • LAM ~1 km horiz. Resolution • Assimilation of frequent/high density data • New developments are required in the new generation of models • Direct model output attractive for users (hydrology, air quality)!!! • New evaluation/verification procedures • Model adaptation/probabilistic interpretation • Increasing development of Ensemble Prediction Systems both as a complement of deterministic forecasting and for assimilation systems COSMO General Meeting 2006 - Bucharest

  4. COSMO Longer-term perspectives (3-5 years) • Develop and improve ensemble prediction systems based on LM (including cloud resolving scale) • Assimilation of ‘all’ available observationssfc / profiles / radar / satellites…high resolutionalso slowly-changing information (soil moisture, vegetation state, etc) • LM performance known, critically discussed and improved Need for more collaboration with other Consortia Mathias Rotach Talk COSMO General Meeting 2006 - Bucharest

  5. Priority Projects • To better concentrate joint COSMO efforts • To optimize the use of COSMO human resources • To facilitate management related to goals which are Considered to be prioritary Problems related to many activities and lack of resources Priority Projects introduced in 2005 COSMO General Meeting 2006 - Bucharest

  6. Scientific Working Groups WG1 WG2 WG3 WG4 WG5 WG6 The present scientific organizationof COSMO SUPPORT ACTIVITIES – WG6 SIR 1DVAR FOR SATELLITE DATA LM_Z COSMO Priority Projects RK UTCS SREPS INTERPRETATION TACKLE DEFICIENCES IN QPF COMMON VERIFICATION – CONDITIONAL VERIFICATION COSMO General Meeting 2006 - Bucharest

  7. 16th Meeting of the COSMO STC Zürich, December 1 and 2, 2005 • 12th Meeting of the COSMO SAC DWD - Offenbach, 3-4 May 2006 • 13th Meeting of the COSMO SAC ARPA-SIM - Bologna, 7-8 Sept. 2006 • 17th Meeting of the COSMO STC Bucharest, General Meeting 2006 & WGs and Projects meetings & Reporting COSMO General Meeting 2006 - Bucharest

  8. 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May 2006 13th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006 • Some of the Projects are still suffering for lack of human resources. For some projects we had tasks without FTE committed and other tasks too crowded. • We still have quite relevant problems about communications. Reports are not delivered on time and, in several cases, not delivered at all. : our COSMO spirit should increase!!! COSMO General Meeting 2006 - Bucharest

  9. Necessity to speed-up the procedure to define activities and projects • May 2006 • The Projects years will be redefined from October to September to be synchronized with the COSMO year. • Projects should be drafted (almost ready) for the SAC meeting of September. • Project drafts will be available on the WEB after the SAC meeting of September. • Projects will be finalized after the contributions coming from the GM discussions • Projects approval by STC will be done at the end of the general meeting. •  • Feedback by STC to project leaders before October the 15th • The project leaders will interact directly with STC members as regards the allocation of FTEs on the different project • Commitments to PL‘s: Nov 15 • Mid November 2006 • May 2005 • SAC (WP Coordinators + SPM) defines a preliminary list of projects fitting COSMO strategy • General Meeting parallel sessions: collection of proposals and fine- tuning of projects • SAC defines a priority list to be submitted to the decisions of STC • STC selects a limited (one-digit) numbers of “top priority projects” • WP coordinators identify Project Leaders • Project Leaders prepare a detailed Project description and a clear project plan (project activities, human resources, milestones) • STC gives the final approval of the projects • STC members assigns human resources to the projects • Final allocation of FTEs after several iterations • Mid of January 2006 COSMO General Meeting 2006 - Bucharest

  10. 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May 2006 13th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006 • The paucity of scientific publications is one of the criticality within COSMO. Scientific papers can be included in the list of deliverables of COSMO projects. • It is important to have on the WEB an updated list of publications related to COSMO and also of presentations at meetings. COSMO General Meeting 2006 - Bucharest

  11. 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May 2006 13th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006 • The COSMO WEB: the management of the web is now working but the content must be revised and updated regularly. • It is necessary to have a common name for our model. Different names associated to the different national applications induce confusion in the people outside COSMO. COSMO General Meeting 2006 - Bucharest

  12. 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May 2006 13th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006 • Evaluation of the FTE actually devoted to the Projects by the COSMO Partners: the computation has been performed and discussed. • Results will be presented at the STC during the general meeting. COSMO General Meeting 2006 - Bucharest

  13. 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May 2006 13th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006 SRNWP/EWGLAM meeting 2006: COSMO delegation As decided during the 2005 EWGLAM/SRNWP meeting held in Slovenia, each Consortium will have 15 minutes for the presentation by the SPM and 2 hours to give scientific presentations in the following thematic areas: • Assimilation • Numerics and coupling numerics/physics • Physics • Predictability and EPS COSMO General Meeting 2006 - Bucharest

  14. 12th Meeting of the Scientific Advisory Committee DWD, Offenbach, 3-4 May 2006 13th Meeting of the Scientific Advisory Committee ARPA-SIM, Bologna, 7-8 September 2006 SRNWP/EWGLAM meeting 2006: COSMO delegation • Assimilation C.Schraff : Overview and strategy on data assimilation. The 1DVAR projects to assimilate satellite data. D.Leun: The LHN scheme of COSMO • Numerics and coupling numerics/physics J.Steppeler: Overview and strategy on Numerics. The LMZ including coupling Num. &Phys., D.Cesari: The Semi-Implicit Semi-Lagrangian version of LM_Z • Physics M.Arpagaus: Overview and strategy on LM Physics. D.Mironov: The UTCS project • Predictability and EPS P.Eckert: COSMO ensemble systems C. Marsigli: the COSMO SREPS project COSMO General Meeting 2006 - Bucharest

  15. COSMO Longer-term perspectives (3-5 years) • Develop and improve ensemble prediction systems based on LM (including cloud resolving scale) • Assimilation of ‘all’ available observationssfc / profiles / radar / satellites…high resolutionalso slowly-changing information (soil moisture, vegetation state, etc) • LM performance known, critically discussed and improved Need for more collaboration with other Consortia Mathias Rotach Talk COSMO General Meeting 2006 - Bucharest