1 / 6

Introduction of CSQSD 16 . 10 .2013

Introduction of CSQSD 16 . 10 .2013. CSQSD: Success story. Common Supplier Quality and Supplier Development (CSQSD) 3 years in operation since March 2010 Created to extend cooperation between AVTOVAZ and Renault-Nissan Alliance for further enhancement of Russian automotive industry.

gwylan
Download Presentation

Introduction of CSQSD 16 . 10 .2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction of CSQSD16.10.2013

  2. CSQSD: Success story Common Supplier Quality and Supplier Development (CSQSD) 3 years in operation since March 2010 Created to extend cooperation between AVTOVAZ and Renault-Nissan Alliance for further enhancement of Russian automotive industry. CSQSD is developing and improving quality level of suppliers in Russia. AVTOVAZ suppliers have increased 10 time their parts quality 2008 2010 2011 2012 • Contract RENAULT- AVTOVAZ • Accord of creating CSQSD • Starting “OOO ЦРКП” • Strong development • Achievement of targets • Audits • Support

  3. CSQSD Human Resources VP RNPO in Russia Vice President Purchasing AVTOVAZ Reporting Objectives Head Office: Togliatti Local Office: Moscow 32 managers and experts 68 managers and experts 100 persons (32 Renault origin & 68 AVTOVAZ origin) OOO CRKP AVTOFRAMOS • 42 operators • (additionally)

  4. CSQSD Organization

  5. Main Tools by CSQSD Standard V3P- VEHICLE PROJECT S-ASES ASES Rank Up / ASES Greenfield Procedure Rank Up CPD* CPD* CPD* PPA* or RQP* Special Audit Product Audit** PDCA / 8 D CONTROL SHIPPING Mur Qualité Firewall *Support to engineering department**Only for critical parts and critical suppliers SES, Rank Up ASIP / STF / SSFTB COMEX Sustainable Development ANPQP support: buyers and supplier training Manufacturing Approval Vehicle Pre-contract Tooling Go Ahead Pre-Concept Contract ABPT2 ABPT1 SOP SOS Concept Freeze Intention PPC Development = 40 W 47 <Upstream< 60 W Optimisation= 36 W Industrialisation = 63 W VC PT1 PT2 Go With 1

  6. Quality tools by Departments

More Related