Big Delay !

Big Delay !. There is a big delay – 1 year Cause: Additional quality control of data was required Very little participation from the community Lately things have warmed up (last 2 months) Several groups have submitted results of step 1

gypsy
Download Presentation

Big Delay !

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Big Delay ! • There is a big delay – 1 year • Cause: • Additional quality control of data was required • Very little participation from the community • Lately things have warmed up (last 2 months) • Several groups have submitted results of step 1 • Several groups have contacted us indicating they are currently working on the experiment • A new timeline has been proposed • Submitted for approval to the GLASS meeting in Japan • If no additional participation will go ahead with the 9 models already working.

  2. Submitted so far – STEP 1 only • SPONSOR – Institute of Geography, Russian Academy • SWAP – Institute of Water Problems, Russian Academy • SEWAB – GKSS Research Center, Germany • CBM – CSIRO, Australia Soon to be submitted • MOSAIC - NASA Goddard, USA • SSib – COLA, USA • VIC – U of Arizona, USA • BATS – UCLA, USA • Sib2 – USU, USA

  3. Other Modeling Groups • Additional groups that have expressed interest: • Noah – NOAA USA • ORCHIDEE – France • MOSES – Met Office UK • SSib – UCLA USA • CLASS - Canada

  4. Updated Timeline • February 2004, Submission of final experimental protocol • March 15th,2004, Submission of model information and default parameter sets used by the models for semi-arid areas • March 15th, 2004, Distribution of forcing data to the participants through the website www.sahra.arizona.edu/pilpssanpedro • October 31st, 2004, Submission of default parameter simulations STEP 1 • November 1st, 2004, Distribution of calibration data for STEP 2 and STEP 3 • November 30th, 2004, Submission of results from STEP 2 – ad hoc calibrations • January 31st, 2004, Submission of results from STEP 3 – automatic calibrations • February 1st, 2005, Distribution of data for STEP 4 • February 28th, 2005 June 15, 2004, Submission of results from STEP 4 • March 31st, 2005 June 30th, 2004, Submission of results from STEP 5 • April 1st, 2005 July 1st, 2004, Distribution of data for STEP 6 • April 30th, 2005 July 30th, 2004, Submission of results from STEP 6 • August/September 2005, Workshop for analysis of preliminary results, at Utah State University. • January, 2006, AMS session for final analysis and presentation of results