1 / 8

2 slot cryostat status

2 slot cryostat status. 2 slot cryostat status. Commissioning is underway! 2 Cassettes installed on 3/18. Sensors and control heater mounted. Multi-layer super insulation blankets on. Leak checking of vacuum jacket – passed. Leak checking of cassette space – passed.

hagen
Download Presentation

2 slot cryostat status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2 slot cryostat status Russ Rucinski, Fermilab, March 29, 2005

  2. 2 slot cryostat status • Commissioning is underway! • 2 Cassettes installed on 3/18. • Sensors and control heater mounted. • Multi-layer super insulation blankets on. • Leak checking of vacuum jacket – passed. • Leak checking of cassette space – passed. • Cryostat is in place and hooked up. Russ Rucinski, Fermilab, March 29, 2005

  3. 2 slot cryostat status • Initial cool down last Friday 3/25. Started late in the day, saw that it would cool, started debugging temperature sensor readout. Ran for 2 hours. Warmed up over the weekend. • Started cooling on Monday 3/28 at 7:30 am, and have been cooling ever since (32 hours now). • Station 1 at 54 K. (more or less stable) • Station 2 at 16.5 K. (slowly decreasing) Russ Rucinski, Fermilab, March 29, 2005

  4. 2 slot cryostat status • Sensors 1 & 2 are redundant 100 Ohm Allen Bradley carbon resistors. They are on stage 2 cold head and thermal link. They agree to a few tenths of a Kelvin. • Sensor 3 is a silicon diode on the upper intercept. • Cooling rate had slowed to -0.1 K/hr earlier today. But now at -0.4 K/hr. Maybe attributed to isolating the vacuum jacket from the turbo cart, or lowering lid heater setpoint by 5 C, or due to something else. Russ Rucinski, Fermilab, March 29, 2005

  5. Commissioning area Russ Rucinski, Fermilab, March 29, 2005

  6. 2 slot cryostat status • Plans • Continue to cool, and obtain coldest temperatures. • Read out cassette temperature sensors independently. • Get heater control loop functioning. • Install low cassette space pressure alarm. • If Problems: • Capacity issue? Run without thermal link to cassette. • Heater attachment location may be suspect. • Sensor self heating issue? • More MLI on sides needed? (shell a few C cold on sides) Russ Rucinski, Fermilab, March 29, 2005

  7. Pictures - Ready for vacuum container Russ Rucinski, Fermilab, March 29, 2005

  8. Cold end pictures Sensor 2, thermal link Sensor 1 – cold end Sensor 3, upper Control heater Russ Rucinski, Fermilab, March 29, 2005