1 / 38

Rock Coring Technology on the Juan de Fuca Plate with the MBARI ROV Tiburon

Rock Coring Technology on the Juan de Fuca Plate with the MBARI ROV Tiburon. Image by D. Au. Presented by: K.A. Salamy M.R. Chaffey, J. Erickson, D. Au, T.C. O’Reilly, D. Stakes. Topics. Brief history of M ultiple-barrel C oring S ystem (MCS) on underwater science platforms.

haile
Download Presentation

Rock Coring Technology on the Juan de Fuca Plate with the MBARI ROV Tiburon

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rock Coring Technology on the Juan de Fuca Plate with the MBARI ROV Tiburon Image by D. Au Presented by: K.A. Salamy M.R. Chaffey, J. Erickson, D. Au, T.C. O’Reilly, D. Stakes

  2. Topics • Brief history of Multiple-barrel Coring System • (MCS) on underwater science platforms • Recent Adaptation of the MCS to the ROV • Tiburon - Project Requirements • - System Design Modifications • MBARI Summer 2000 Coring Highlights - Juan de Fuca Plate

  3. ALVIN Submersible (1991, 1996) ROV ROPOS (1998) ROV Ventana (1992-1999)

  4. Project Purpose - Increased depth capabilities - 4000 meters - Wider geographical sampling coverage • Adapt the MCS to Tiburon for marine geological sampling

  5. Direct Transfer of Existing Technology • Minimum changes to Ventana design • Main modifications/additions to: • - MCS control system • - Software Architecture (real-time feedback) • - New toolsled frame • Summer 2000 “hard” deadline date

  6. Functional Requirements • 4000-meter MCS operational depth • Explosive cutter software and hardware must operate safely and reliably • Tiburon MCS performance must equal • existing design • - Sufficient power to core • - Maintain position while coring • - Similar coring rates (0.5m / hr) • - Horizontally-level cores

  7. Design Issues • Power for coring on Tiburon - 15kW • - Hydraulic power • - Thrust for Weight-On-Bit • - Station-keeping abilities • Re-use versus Redesign of existing system - Sensing and control - Explosive cutter circuit - Software architecture

  8. System Design Requirements • Total power to operate MCS (< 5.3 kW) • Minimum drillstring stall torque ~ 130 Nm • RPM variable from 0 to +/- 400 RPM • Provide 220 lbs Weight-On-Bit • Use standard Tiburon toolsled frame

  9. Ventana Performance

  10. Estimated Tiburon Performance

  11. Weight-On-Bit Analysis 138 lbs. 270 lbs. 270 lbs.

  12. Tiburon Power Consumption Values

  13. Image by D. Au

  14. Data-CONcentrator (DCON) for Sensing and Control • Versatile hardware development • - Multiple 2A current digital outputs for • hydraulic valve control • - Analog inputs for reading sensors • - Analog outputs for hydraulic servo valves • - Digital outputs for controlling cutter circuit • - Digital inputs for monitoring cutter status • - Ground fault, humidity and water alarms • Efficient software development

  15. Image by D. Au

  16. Resulting Tiburon MCS Design Image by J. Erickson

  17. Explosive Cutter Requirements • Shears drill string when • Commanded by pilot and below 150 meters or • System armed and power lost for one hour and below 150 meters • Does NOTfire otherwise!

  18. Image by D. Au

  19. Explosive Cutter Firing Sequence Pilot commands “fire” Power plug inserted on deck Pressure switch closes Pilot commands “arm” FAST FIRE POWER PLUG 150 METERS ARMED Power fail fire DELAYED FIRE

  20. Disarmed Armed Fast-firing “Disarm” button pushed orpressure switch opens “Disarm” button pushed orpressure switch opens “Arm” button pushed and password entered “Disarm” button pushed orpressure switch opens Delayed- firing DCON power ON “Fast-fire” button pushed and password entered DCON power OFF DCON power OFF “Fast-fire” button pushed and password entered * 1 hour elapsed 15 seconds elapsed Explosive Cutter State Diagram Fired * Allowable if cutter mistakenly believes IBC power is OFF Software-initiated transition Hardware-initiated transition

  21. Application Software Requirements • Graphical user interface (GUI) • - Display and control MCS state • Accept and process user commands • Sample and distribute sensor telemetry • Sense and report DCON “events”

  22. Western Flyer optical fiber serial lines Sonar DCON Main vehicle computer Camera DCON MCS DCON Tiburon

  23. DCON micro- processor Main vehicle computer DataManager items GUI workstation alarms, events Main task Sampler sensor telemetry DCON 196 CPU Command monitor commands DCON application components - Object Oriented Techniques provide rapid software development that is robust, efficient and maintainable.

  24. DCON micro- processor Main vehicle computer DataManager items GUI workstation alarms, events Main task Sampler sensor telemetry DCON 196 CPU Command monitor command commands telemetry • User pushes Drill button on GUI to begin coring; GUI writes DataManager “commands” item to “ON”

  25. DCON micro- processor Main vehicle computer DataManager items GUI workstation alarms, events Main task Sampler sensor telemetry DCON 196 CPU Command monitor command commands telemetry • Command monitor task on main vehicle computer detects change in “commands” DataManager item • Reads value, checks for valid requested state

  26. DCON micro- processor Main vehicle computer DataManager items GUI workstation alarms, events Main task serial Sampler sensor telemetry DCON 196 CPU Command monitor command commands telemetry • Command monitor task writes “switch on” serial command to hydraulic valve switch card on DCON • Switch closes

  27. DCON micro- processor Main vehicle computer DataManager items GUI workstation alarms, events Main task serial Sampler sensor telemetry DCON 196 CPU Command monitor command commands telemetry • Sampler task periodically reads card state via serial line

  28. DCON micro- processor Main vehicle computer DataManager items GUI workstation alarms, events Main task serial Sampler sensor telemetry DCON 196 CPU Command monitor command commands telemetry • Sampler task updates DataManager item to reflect new switch state

  29. DCON micro- processor Main vehicle computer DataManager items GUI workstation alarms, events Main task serial Sampler sensor telemetry DCON 196 CPU Command monitor command commands telemetry • GUI detects changed value of “switch state” item, updates display

  30. DCON micro- processor Main vehicle computer DataManager items GUI workstation alarms, events Main task serial Sampler sensor telemetry DCON 196 CPU Command monitor command commands telemetry • Main task monitors the DCON for unsolicited events (e.g., alarms and events), propagates the events through DataManager, and updates the GUI display

  31. CLEFT DRILL CORE SAMPLE LOCATIONS

  32. Mendocino Ridge Core cm

  33. Science Benefits • MCS used on 7 geology dives - 11 cores acquired - Similar coring rates - High resolution sampling • All cores deeper than 2000 meters.- Deepest at 3,160 meters. • Coreholes horizontally-level • - Future instrument emplacements.

  34. Additional Design Benefits • Fast integration of MCS on Tiburon- 1 hour toolsled change-out • Consistent use of proven applications • - Interchangeable toolsleds • - Modular DCON-based electrical architecture • - Application framework software architecture • Efficient implementation of new systems- Ensures pilot familiarity (command / controls)- Minimizes pilot training time