240 likes | 503 Views
DRHOUSE PROJECT. ACRONYM: DRHOUSE PROJECT NAME: D evelopment of R apid H ighly-specialized O perative U nits for S tructural E valuation FRAMEWORK: Preparatory action on an EU rapid response capability (DG Echo – Civil Protection) STARTING DATE: 1 June 2010
E N D
ACRONYM: DRHOUSE PROJECT NAME: Development of Rapid Highly-specialized Operative Units for Structural Evaluation FRAMEWORK: Preparatory action on an EU rapid response capability (DG Echo – Civil Protection) STARTING DATE: 1 June 2010 DURATION: 24 months EXTENSION: 10 months
COST OF THE PROJECT: 1.879.664,00 € EU FUNDINGS (90%): 1.691.697,60 € COFINANCING (10%): 187.966,40 €
COORDINATING BENEFICIARY ASSOCIATED BENEFICIARIES (2) • ItalianCivilProtectionDepartment (CPD) • EUCENTRE (EUC) • Department of Fire, Public rescue and Civil Defence(VVF)
AIMS Implementation of a EuropeanCivilProtection “Macromodule” for building damage and safetyassessment and building propping and shoring. MACROMODULE NAME BUILD-SAFE (Request of the Commission)
AIMS The macromoduleiscomposed of 3 differentmodules: BSA=Basic SafetyAssessmentModule (Residentialbuildings) Responsible DPC ASA=Advanced SafetyAssessmentModule (Strategic buildings) Responsible EUC STC=Short TermCountermeasureModule (Alltypes of buildings, monumental) Responsible VVF
COMPOSITION OF THE BUILD-SAFE MACROMODULE Pre-Team MissionLeader DPC 1 Admin Log. S&S IM IT LO Nurse Media DPC EUC VVF Logistic Cell 3~ 5 BSA ASA STC TL TL TL DPC EUC VVF 15 15-25 25
Project Tasks Task A.Project Management Task B.Module design and implementation Task C.Exercise Task D.Deployment Task E.Training Task F.Dissemination Task G.European network of experts
Task B. Module design and implementation B.1 Inventory of resources B.2 Modulerequirements B.3 Module Design B.4 Self-sufficiency B.5 ASA-BSA-STC interoperability B.6 SOPs B.7 Stand-by arrangements
Task B.4 Selfsufficiency Lodging (hotel or tent camp) Food (K-rations, dehydrated,..) Sanitation Water (drinkable or not) Energy (local network or generators) On site transportation (rentedcars/van/truck, local drivers) Telecommunication (GSM, satellite, internet) Language (interpreters) Safety and security Health …………….
TENT CAMP (tents, filedkitchen, generators, air conditioning, showers, latrines, desks, …)
K-rations= breakfast + lunch + dinner Dehydratedfood
Task E.Training • About 100 trained technicians for each module • Advanced training mainly based on • Foreign methodologies for safety and damage assessment • Information Technology • EU Civil Protection Mechanism, • Intervention in MS and outside EU (cultural awareness, Safety and security, media contacts, LEMA, OSOCC, etc) • Interoperability
Task D. Deployment On MIC request Up to 15.000 Km Up to 15 days According to the actualneeds, the wholemacromodule or just one or twomodules can be deployed
ROAD DEPLOYMENT Up to thousands of Kilometers AIR DEPLOYMENT For greaterdistance. In such a case cars/vanswill be rented on site. SEE DEPLOYMENT Ifnecessary (Islands)
Air deployment, oneaircraft (verycostly) Pax Pallets KC 767A COMBI (10 pallets+96 pax)
P A Air deployment, more thanoneaircraft (more affordable)
Additional addressed deployment issues • Passport • Visa • Vaccination • IT transportation • Stand-by arrangements • Cargo arrangements • Insurance • ……….
Task C. Exercise Only if the Commission does not require the deployment
Task F.Dissemination F.1 Media, brochures, .. F.2 Raiseawareness F.3 Technical dissemination F.4 Technical publications Internet site, e-brochure, logo
DPC InvolvedPersonnel Project Responsible: Prof. Mauro Dolce DPC BSA moduleresponsible: A. Goretti Sandro Coppari(IT), Francesco Giordano (Deployment), Tiziana Lo Presti (Reporting), Cosmo Mercuri (DB Technicians), Claudio Moroni (SOP), Elena Speranza (Training), Lorella Salvatori e Stefano Ciavela (Emergency management), Grazia Curalli, Danilo Bilotta, Ambra Sorrenti ed Eleni Kapocianni(International Unit), Marco Agnoloni, Valter Macioci, Giambattista Artesi, Roberto Quinzi e Claudio Monteferri (Logistics), Marc’Antonio Santacroce (Aeronautics), Annalisa Montanari (Health), Cesare Castiglioni (Telecommunications), Biagio Prezioso (IT), Gianluca Garro e Ilaria Salvi (Press), Valeria Bernabei (Dissemination), Matteo Valente, Romeo Frisina(Documentation), Lavinia Di Meo (Legal Issues), Virginia Giallanza e Andreana Valente (Administration), Davide Savone(SW development), Giancarlo Marcari (project management) Back