70 likes | 227 Views
RR-TAG Liaison Report IEEE 802.18 - 802.22. 2007-11-15. >. Authors :. Radio Regulatory – TAG. Liaison - IEEE 802 Wireless WGs - National and International Regulatory Agencies Supports Wireless WGs Spectrum Requirements
E N D
RR-TAG Liaison ReportIEEE 802.18 - 802.22 2007-11-15 • >. Authors: Peter Murray, TMG, Inc.
Radio Regulatory – TAG • Liaison - IEEE 802 Wireless WGs - National and International Regulatory Agencies • Supports Wireless WGs Spectrum Requirements • Tracks regulatory actions and provides advice to regulators to foster effective use of licensed and unlicensed spectrum Peter Murray, TMG, Inc.
RR-TAG Efforts Presentation of The Wi-Fi Alliance DFS Best Practices document Presentation on EU 5GHz Regulatory changes Presentation on aircraft use of wireless networks Review of IMT inputs Incorporation of these into the requirements and evaluation document Output documents will be forwarded to the EC. *The TCAM (Telecommunications Conformity Assessment and Market Surveillance Committee) is the standing Committee assisting the Commission in the management of Directive 99/5/EC. Peter Murray, TMG, Inc.
RR-TAG Update • Any 5GHz RLAN products sold in the EU • After 3/31/08 must meet EN 301 893 v1.3.1 or 1.4.1 requirements • After 6/30/08 must be able to detect staggered PRF (3 PRF values) in 5600 - 5650 MHz band; or block the band (channels 120, 124 and 128) • After 3/31/09 must also meet EN 301 893 v1.5.1 requirements: • Detect 0.8uS pulse width across 5250 – 5350 and 5470 – 5725 MHz bands • Detect staggered PRF across 5250 – 5350 and 5470 – 5725 MHz bands • Include a solution for weather radar noise calibration period (10 min CAC) • After 3/31/10 must meet EN 301 893 v1.6.1 • All the 1.5.1 requirements • Detect 0.5uS pulse width across 5250 – 5350 and 5470 – 5725 MHz bands Peter Murray, TMG, Inc.
Documents available on the 802.18 Site • WFA-DFS-Best Practices • 18-07-0090-00-0000-eu-5ghz-regulatory-changes • 18-07-0096r0_Dedicated_Aviation_Spectrum_Alternatives Peter Murray, TMG, Inc.
Future Plans • Review Consultations from Regulators • Continue IMT-Advanced process • Next meeting – Taipei Taiwan, : January 2008 Peter Murray, TMG, Inc.
Questions? Peter Murray, TMG, Inc.